My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03682
CWCB
>
Water Supply Protection
>
Backfile
>
16000-16999
>
WSPC03682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:35:57 AM
Creation date
10/9/2006 4:07:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
4/5/1978
Title
- San Luis Valley Project Closed Basin Division - 1976-1979 - Statement of Richard D Lamm before the Subcommittee on Public Works, Committee on Appropriations, US Senate, DC 4/5/78
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00071S <br /> <br />. <br /> <br />. <br /> <br />and is designed to solve many of the problems with Indian <br />reservations in Colorado. Both the Southern Ute and Ute Mountain <br />Ute tribes have substantial amounts of land which would be served <br />by the Animas-La Plata project. The project also is designed to <br />solve vexatious problems created by pending litigation con- <br />cerning Indian water rights. An additional COinponent of the <br />project is to serve nonIndian populations in Colorado and New <br />Mexico, primarily for agricultural and municipal purposes. <br /> <br />Unfortunately, the evaluations of this project have been <br />caught up in continuing and long-standing delays. At the time <br />the project was authorized, it was represented to Congress that <br />all preconstruction planning could be cOinpleted in three years. <br />Ten years later, the definite plan report and environmental iinpact <br />statements have yet to be COinpleted. However, Colorado has now <br />been advised by the Bureau of Reclamation that such planning will <br />be completed before January 1, 1979, and that the project has a <br />construction capability to the extent of $500,000 during FY 1979. <br /> <br />It is the position of the state that the definite plan <br />report and environmental impact statement must be completed <br />expeditious ly without further delays. Moreover, if the Bureau <br />proceeds on schedule, the state and federal governments will be <br />able to evaluate the merits of this project well before the end <br />of FY 1979 and make recommendations as to whether construction <br />should proceed. <br /> <br />. <br /> <br />The genesis for this project was the Colorado River Storage <br />Project Act of 1956. By that act, the Animas-La Plata project <br />was designated as a potential participating reclamation project, <br />subject to a finding of feasibility and specific authorization by <br />the Congress. cBoth of. these latter events have occurred. Forty- <br />six percent of the power revenues derived from the Colorado River <br />Storage Project were specifically and exclusively dedicated to <br />colorado to assist in the repayment of those project features <br />attributable to irrigation. The necessary revenues will accrue <br />to Colorado during the repayment period for the Animas-La Plata <br />project. If the law is to be followed, these revenues cannot be <br />used for any purpose other than to assist in the repayment of <br />Colorado reclamation projects. We simply ask that a portion of <br />these revenues be dedicated to the Animas-La Plata project as <br />Congress has spcifically directed if construction proceeds as <br />planned. . <br /> <br />4. Fruitland Mesa and Savery-Pot Hook pro;ects. These two projects <br />were authorized in 1964, also as participating units of the <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.