My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03520
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:35:21 AM
Creation date
10/9/2006 3:59:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
Boyle Engineering
Title
Agricultural Engineering Study - La Plata Watershed - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1719 <br />0.4.3 Cropping Pattern <br />For the preliminary analysis of PIA, a cropping pattern with the <br />highest net agricultural returns was used. Table D.3 identifies <br />this cropping pattern as well as the net agricultural return. <br />Parcels in the La Plata watershed are located in climatic zones D, E, <br /> <br />F, G, and H. <br /> <br />D.4.4 Preliminary PIA Analysis <br />A preliminary PIA analysis was performed comparing a parcel's <br />payment capacity with a preliminary estimate of the cost to pump <br />water from the river to the parcel. This preliminary water cost was <br />based on the static pumping lift (the difference in elevation from <br />the water surface in the river to the elevation of the parcel) for <br />gravity irrigated fields or plus a field delivery pressure of 60 psi <br />for sprinkler irrigation. Detailed tabulations of the analysis are <br />shown in Appendix 0.1. Table D.4 identifies only those parcels with <br />an initial positive residual payment capacity requiring further <br />consideration. A total of 82 parcels covering 2,573 acres showed an <br /> <br />initial positive residual payment capacity. <br /> <br />An off-farm irrigation transmission system was designed for those <br /> <br /> <br />parcels near the La Plata River showing an initial positive payment <br /> <br /> <br />capacity. Those calculations are shown in Appendix D.2 and <br /> <br /> <br />summarized in Table D.5. Parcels with a positive payment capacity <br /> <br /> <br />after comparing the residual payment capacity to the cost of water <br /> <br /> <br />are initially identified as practicably irrigable. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.