My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03491
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:35:14 AM
Creation date
10/9/2006 3:58:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.O
Description
Colorado River Water Projects - Animas La Plata - Project Funding
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/1/2003
Author
DOI-BOR
Title
Animas La Plata Project - Construction Cost Estimates - Report to the Secretary - November 2003
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />COSTS COMPARISON <br /> <br />ANIMAS-LA PLATA PROJECT, COLORADO AND NEW MEXICO <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />o <br />o <br />.... <br />N <br />(,0) <br />...... <br /> <br /> 1$1,000,000l <br /> FSEIS 21 FSEIS CURRENT DIFFERENCE <br />FEATURE ESTIMATE ESTIMATE - ESTIMATE JANUARY 2003 (Current minus <br /> APRIL 1999 INDEXED . Field, Original Indexed) <br /> TO OCTOBER 2003 Total Costs Noncontract <br />Ridges Basin Dam $145.0 $160,2 . $225.7 $176,7 $49.0 $65.5 <br />Duranao Pumoing Plant $36.3 $40.1 $92.7 $73.4 $19.3 $52.6 <br />Ridges Basin Inlet Conduit $8.7 $9.8 $27.2 $19.9 $7.3 $17.4 <br />Navajo Nation Municipal Pioeline $24.0 $27,0 $47.0 $38,3 '.$8.7 $20.0 <br />Permanent Operating Facilitv $2.5 $2.1 $0.4 $2.5 <br />Subtotal $214.0 . $237.1 $395.1 $310.4 $84.7 $158.0 <br />Cultural Resources Mitigation $9.0 $18.3 3/ $17.3 $13.0 $4.3 -$1.0 <br />Wetlands and Fish and Wildlife Mitioation $12.8 $14.4 $18.8 $12.8 $6.0 $4.4 <br />Subtotal $21.8 $32,7 $36.1 $25.8 $10.3 $3.4 <br />Other Project Costs Through FY 1998 $68.0 $68.0 $68.0 <br />Rounding $0,1 $0.8 $0.7 <br />TOTAL $303.8 1/ $337.9 $500.0 $162.1 <br /> <br />11 Does not include $40M Tribal Resource Fund 2/ July 2000 Final Supplemental Environmental Impact Statement <br />31 Includes additional funding taken from Ridges Basin Dam contingencies and added to Cultural Resources following contract negotiations with UMU Tribe in 2002 <br /> <br />3-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.