My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03491
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:35:14 AM
Creation date
10/9/2006 3:58:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.O
Description
Colorado River Water Projects - Animas La Plata - Project Funding
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/1/2003
Author
DOI-BOR
Title
Animas La Plata Project - Construction Cost Estimates - Report to the Secretary - November 2003
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />001223 <br /> <br />April 16, 1999 <br /> <br />April }7, 1999 <br /> <br />April 1999 <br /> <br />July 19,1999 <br /> <br />August 3, 1999 <br /> <br />Sept. 27-30,1999 <br /> <br />October 20, 1999 <br /> <br />Oct. 1-18, 1999 <br /> <br />October 25, 1999 <br /> <br />Oct. 27-Nov. 13, 1999 <br /> <br />October 30, 1999 <br /> <br />.. .. ~~ .. <br /> <br />Ute Mountain Ute Tribe provides changes to the draft <br />SOW. <br /> <br />Ninety-day public cornment period on Draft <br />Supplemental EIS begins (includes 30-day extension). <br /> <br />NEPA compliance team diagram (snowman diagram). <br /> <br />Modification No. 016 to Cooperative Agreement <br />issued to UMUT. <br /> <br />Final Plan of Approach agreement is completed with <br />UMUT. <br /> <br />Core Team begins preparation of Advanced <br />Preliminary DSEIS (APDSEIS.) <br /> <br />HR 3112 - Colorado Ute Settlement Act Amendments <br />of 1999 introduced by Representative McInnis of <br />Colorado. <br /> <br />Preparation and distribution of Advanced Prelininary <br />Draft Supplemental EIS continues. This version <br />included a Feasibility Design and Estimates exhibit, <br />but it was incomplete. The narrative recognized the <br />following cost items were incomplete: relocation of <br />property of others; gas pipelines and CR211; Basin <br />Creek Improvements; operating costs including <br />maintenance; and maintenance facility. <br /> <br />Reclamation provides cornments on Advanced <br />Preliminary Draft Supplemental EIS to Core Team. <br /> <br />Core Team prepares Preliminary Draft supplemental <br />EIS. It includes Feasibility Design and Estimates. The <br />narrative mentions that a "tabular detail of quantities <br />and estimated costs appears at the end of this section." <br />This information was not included. The narrative also <br />mentions that for the total project cost, several items <br />must be added, including cultural resources, recreation <br />facilities, fish and wildlife mitigation, wetland <br />mitigation, and interest during construction. <br /> <br />Proposal to complete NEP A Compliance from Area <br />Office to Regional Director. <br /> <br />1-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.