Laserfiche WebLink
<br />'1" <br /> <br />" ~0A24 <br />.,. . <br /> <br />. <br /> <br />. <br /> <br />Work Tasks <br />South Platte river model start End <br />. study Period 3-91 7-91 <br />n. <br />B. Data base building <br /> 1. Water supply 7-90 4-93 <br /> 2. Water use 7-90 2-93 <br /> a.irrigation <br /> b.municipal <br /> c.industrial <br /> d.hydro power <br /> e.recreational <br /> f.fish & wildlife <br /> 3. Hydraulic capacity 3-93 6-93 <br /> 4. climate 10-90 4-93 <br /> 5. Aquifer data 4-93 7-93 <br />C. Water operation criteria 10-92 12-92 <br />D. Water demands 5-93 9-93 <br />E. Present water supply 11-93 1-94 <br />F. Initiate Model Development 12-93 6-94 <br />G. Run baseline operation 7-94 9-94 <br />H. Evaluation study runs 10-94 3-95 <br />