My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03372
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:50 AM
Creation date
10/9/2006 3:53:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Colorado River-Colorado River Basin-Gunnison River General Publications-Corresp-Reports
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/22/1945
Title
Grand Valley-USBR Rehabilitation Program-Oct 1945-Preliminary Inventory
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001363 <br /> <br />.. <br /> <br />PREUMINARY REPORT <br />REHABILITATION INVENTORY <br /> <br />ORCHARD MESA DIVISION <br />Grand Valley Project - Colorado <br /> <br />Distribution System <br />Straighten Main Canals <br />Line Main Canals <br />Line Laterals (Material for <br />Cooperators) <br />New Regulating Gates & Work <br />on By-pass At Pumping <br />Plant <br />Test & Remodel Pump Delivery <br />Pipes <br />Level Spoil Banks, Main Canals <br /> <br />Rehabilitation <br />Quantities <br />Unit Total <br /> <br />Mile 3.0 <br />Mile 10.0 <br /> <br />Mile 10.0 <br /> <br />Lump sum <br /> <br />Lump sum <br />LiI.'llp sum <br /> <br />~: Much of the earthwork listed above should <br />account with equipment listed below. <br />Drainage System <br />Cleaning Open Drains <br />Level Spil Banks <br /> <br />Mile <br />Mile <br /> <br />10.0 <br />10.0 <br /> <br />22 October 1945 <br /> <br />Cost of Rehabilitation <br /> <br />Unit <br /> <br />$ 4,750. <br />30,300. <br /> <br />500. <br /> <br />Sub-total <br />be done by force <br /> <br />400. <br />200. <br />Sub-total <br />account. <br /> <br />NOTE: This work is also intended to be done by force <br /> <br />Buildings <br />Shop at Pumping Plant, <br />Warehouse, 3Ox80xlO <br /> <br />40x50xl6 Lump sum <br />Lump sum <br /> <br />Equipment <br />PickUp, purchase new <br />Trucks, l~ ton, purchase new <br />Tractor, R06, purchase new <br />Tractor, RD4, major overhaul <br />Dragline, ~ yd., purchase new <br />Carryall, 4 yd. purchase new <br />Ripper, purchase new <br /> <br />Grand Total Inventory Cost <br /> <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />Exclusive of Equipment in last item <br /> <br />Sub-total <br /> <br />s <br /> <br />( % Labor <br />( <br />( S Material <br />( <br />( % Supplies <br /> <br />~ <br />$ 14,250. <br />303,000. <br /> <br />5,000. <br /> <br />6,000. <br /> <br />3,000. <br />2,000. <br />333,250. <br /> <br />4,000. <br />2,000. <br />339,250. <br /> <br />5,000. <br />2,000. <br />346,250. <br /> <br />-' <br /> <br />. <br />- <br /> <br />. <br />- <br /> <br />-' <br /> <br />. <br />- <br /> <br />48.5 <br />30.5 <br />21.0 <br /> <br />See descriptive matter attached for particulars regarding the various types of <br />work and the reasons therefor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.