Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1467 <br /> <br />Preliminary Payment Capacity: The preliminary net <br />minus the on-farm irrigation capital, maintenance, <br />pumping cost in dollars per acre. <br /> <br />ag. returns <br />labor, and <br /> <br />Water Source Elevation: The water source diversion point nominal <br />elevation. <br /> <br />Static Lift: The difference in elevation of the parcel 's high <br />elevation and and water source elevation in feet. <br /> <br />Annual Power Cost/Acre: The cost of electrical energy per acre per <br />year to serve the parcel considering only the static lift in the case <br />of gravity irrigation or the static lift plus 139 ft. (60 psi) for all <br />types of sprinkler irrigation. <br /> <br />Residual Preliminary Payment Capacity: The result of the preli- <br />minary payment capacity minus the annual power cost for pumping at <br />the water supply source in dollars per acre. <br />