Laserfiche WebLink
<br /> c e u e an uClget or as ' <br />Subtask Description StMt Dale End Date Budgel (5) <br />No. Boyle RTi Total <br />.tOI Phase II Inslrearn Rows Ocl 28,96 Nov 4,96 5900 SO 5900 <br />4.02 Map Preparation Jull.96 No... 4.96 SO SO SO <br />4.03 Aggregate Irrigation StruCUll'CS Nov 4,96 Nov 29.% 56,200 SO $6,200 <br />4,04 Add Aggregated Suuctures 10 Nov 18.96 Nov 20.96 S600 SO S600 <br /> Network <br />4.05 Define Waler Right Classes Aug 12.96 Aug 19.96 $3,900 SO 53,900 <br />4,06 Assign Return Aow Noy 20,96 Noy 29,96 $2,100 SO 52.100 <br /> Characteristics <br />4.07 Generate Aggregated Nov 20.96 Nov 29.96 5600 SO 5600 <br /> Parameters <br />4,08 Assign Aggregated Irrigation Aug 8.96 Aug 12,96 S600 SO S600 <br /> Efficiencies <br />4,09 Generale New .ddm and .ddh Nov 22.% Nov 29,96 $1.600 SO $1,600 <br /> Files <br />4.10 Aggregate M&I Demands Nov 4.96 Novll,96 52.400 SO $2.400 <br />4.11 Aggregate Reservoirs and Stock Novll,96 Nov 25.96 $3,300 SO $3.300 <br /> Ponds <br />4.12 Add In.meam Flows No... 27,% Nov 29,96 1800 SO 1800 <br />4.13 Generale Basenows Dee 1.96 Dee 9,96 54.400 SO S-l,-lOO <br />4.14 Calibration Dee 10,96 Dee 31.96 S7.600 SO S7,600 71.-1. <br />.U5 Generate Baseline Data Sel Jan 3.97 Jan 6,97 S-lOO SO S400 <br /> r <br />" 16 Engineering Jan 6.97 Jan 10.97 S3.800 SO S3,800 <br /> Repon/Documentation , <br />Other Direct Charges (ODC) $5..\00 SO S5Aoo <br />Tota] Task Budget & by Consultant Group I Aug 8.96 I Jan 10.97 W,600 SO $.4,600 <br /> <br />S h d I <br /> <br />dB d <br /> <br />~ T k 4 <br /> <br />1036 <br /> <br />Phase ilia Scope of Services <br /> <br />A-I-l <br /> <br />June 12, 1996 <br />