Laserfiche WebLink
<br />1077 <br /> <br />Subtask 1.01 Hardware and Software Needed for CRDSS Access. <br /> <br />Objective: The Boyle and RTI groups need to be able to effectively communicate with existing <br />CRDSS team members and acquire the tools necessary for the Phase IIla enhancement <br />of the water resource basin models, <br /> <br />Prerequisite: Before Task 2, the CRDSS 2nd Year Consulting Team will prepare two workstations <br />(1 CRDSS SGI Indy workstation with Mosaic, on-line documentation, Statemod <br />program, Statemod GUI, Statemod River Basin applications, consumptive use model, <br />VDB, and maps but no relational database, and an Indigo 1 SGI workstation <br />containing the WRPM program, interface and river basin applications). <br /> <br />Approach: 0 <br />1. Boyle: Initiate a frame relay internet connection (> =56 kbps) with a service provider such <br />as Colorado Supernet. $ loo/month will be made available during Phase IIla contract period <br />to partially offset Boyle's costs of this connection. <br />2. RTISW; Maintain a frame relay internet connection throughout the Phase IIla contract <br />period, $ lOO/month will be made available during Phase lIIa contract period to partially <br />offset RTI's costs of this connection, <br />3. Boyle: Install two SGI workstations (Indy and an Indigo 1) at Boyle offices. These two <br />workstations will be connected to the Internet described in subtask 1, <br />4. RTISW: Provide up t020 hours of support by Steve Maiers in installing the two SGI <br />workstations at Boyle and initiating an internet connection at Boyle" <br /> <br />Deliverables: <br />1. 56 kbps Internet connection between Boyle and other CRDSS locations. <br />2. 56 kbps Internet connection between RTI and other CRDSS locations. <br />3. Two SGI workstations installed at Boyle's office. <br />4. Software/network support by RTI of Boyle's network and workstation envirornnent. <br /> <br />Subtask 1.02 Attend CRDSS User Training Sessions, <br /> <br />Objective: To provide an organized overview of the CRDSS system for the Boyle Group. <br /> <br />Approach: <br />1. Boyle: Include two members of the Boyle group at anyone time in the Phase II user <br />training sessions which will occur in either the 2nd week or 3rd week of July, 1996 <br />(assumed 35 hours per participant). <br /> <br />Deliverables: <br />I. Boyle group familiarization through formal CRDSS user training. <br /> <br />Phase Ill. Scope of Services <br /> <br />A-3 <br /> <br />June 12, 1996 <br /> <br /> <br />