My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03144
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:02 AM
Creation date
10/9/2006 3:46:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/12/1996
Title
Boyle IIIa WRP Enhancement-Phase IIIa Scope of Services-Tasks 1-11-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1077 <br /> <br />Subtask 1.01 Hardware and Software Needed for CRDSS Access. <br /> <br />Objective: The Boyle and RTI groups need to be able to effectively communicate with existing <br />CRDSS team members and acquire the tools necessary for the Phase IIla enhancement <br />of the water resource basin models, <br /> <br />Prerequisite: Before Task 2, the CRDSS 2nd Year Consulting Team will prepare two workstations <br />(1 CRDSS SGI Indy workstation with Mosaic, on-line documentation, Statemod <br />program, Statemod GUI, Statemod River Basin applications, consumptive use model, <br />VDB, and maps but no relational database, and an Indigo 1 SGI workstation <br />containing the WRPM program, interface and river basin applications). <br /> <br />Approach: 0 <br />1. Boyle: Initiate a frame relay internet connection (> =56 kbps) with a service provider such <br />as Colorado Supernet. $ loo/month will be made available during Phase IIla contract period <br />to partially offset Boyle's costs of this connection. <br />2. RTISW; Maintain a frame relay internet connection throughout the Phase IIla contract <br />period, $ lOO/month will be made available during Phase lIIa contract period to partially <br />offset RTI's costs of this connection, <br />3. Boyle: Install two SGI workstations (Indy and an Indigo 1) at Boyle offices. These two <br />workstations will be connected to the Internet described in subtask 1, <br />4. RTISW: Provide up t020 hours of support by Steve Maiers in installing the two SGI <br />workstations at Boyle and initiating an internet connection at Boyle" <br /> <br />Deliverables: <br />1. 56 kbps Internet connection between Boyle and other CRDSS locations. <br />2. 56 kbps Internet connection between RTI and other CRDSS locations. <br />3. Two SGI workstations installed at Boyle's office. <br />4. Software/network support by RTI of Boyle's network and workstation envirornnent. <br /> <br />Subtask 1.02 Attend CRDSS User Training Sessions, <br /> <br />Objective: To provide an organized overview of the CRDSS system for the Boyle Group. <br /> <br />Approach: <br />1. Boyle: Include two members of the Boyle group at anyone time in the Phase II user <br />training sessions which will occur in either the 2nd week or 3rd week of July, 1996 <br />(assumed 35 hours per participant). <br /> <br />Deliverables: <br />I. Boyle group familiarization through formal CRDSS user training. <br /> <br />Phase Ill. Scope of Services <br /> <br />A-3 <br /> <br />June 12, 1996 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.