My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC03144
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC03144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:34:02 AM
Creation date
10/9/2006 3:46:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/12/1996
Title
Boyle IIIa WRP Enhancement-Phase IIIa Scope of Services-Tasks 1-11-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Task I1Ia-3 <br /> <br />Yampa River Basin Model Enhancement <br /> <br />Objective: The Yampa River basin model will be enhanced to include the approximately 25 <br />percent of current water use which was left "in the gage" in the Phase II model. <br />Additional diversions and storage structures will be aggregated to produce a <br />manageable data set and to avoid significantly degrading computational performance. <br />The final model will be calibrated and documented, <br /> <br />Prerequisite: The Phase II Yampa River Basin model is documented and calibrated with <br />approximately 75 percent of the current water use modeled and with irrigation <br />demands based on the 1993 GIS mapping in the calculated scenario, <br /> <br />Assumptions: - Study period is 1975 through 1991. <br />- Total irrigation consumptive use is defmed as the consumptive use associated with <br />the irrigated acreage recorded in the CRDSS irrigated acreage spatial database, <br />Structures and water rights not tied to irrigated parcels will not be included in the <br />model, but will be documented as being excluded, <br /> <br />Task Leader: Meg Frantz (Boyle) <br /> <br />1055 <br /> <br />Phase IlIa Scope of Services <br /> <br />A-25 <br /> <br />June 12, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.