My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02964
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC02964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:33:16 AM
Creation date
10/9/2006 3:40:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.102.03.I
Description
Colorado River Water Projects - Aspinall Storage Unit - Morrow Point - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/5/2002
Author
DOI-BOR
Title
Morrow Point Trash Rack Cleaning Project - Draft Environmental Assessment - Reviewed Copy
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />u~ . <br />.~.' <br /> <br />000347 <br /> <br />environment; preparation of an Environmental Impact Statement would not be required before' <br />the action could be implemented. <br /> <br />Morrow Point Dam was completed in 1968 as part of the Aspinall Unit of the Colorado River <br />Storage Project (CRSP). Blue Mesa. Morrow Point and Crystal Reservoirs on the Gunnison <br />River are operated as a system to comprise the Aspinall Unit. Other features of <br />the CRSP include Flaming Gorge Dam on the Green River, Navajo Dam on the San Juan River, <br />and Glen Canyon Dam on the Colorado River. The Aspinall Unit is located in Gunnison and <br />Montrose Counties, Colorado, along a 40,mile reach of the Gunnison River as shown on the <br />Frontispiece Map, The Aspinall Unit is operated by Reclamation. while the land and waters <br />associated with the reservoirs are managed by the National Park Service as the Curecanti <br />National Recreation Area. Reclamation operates these reservoirs and power plants to meet the <br />followjng authorized purposes: <br /> <br />. Regulate the tlow of the Colorado Ri ver <br />. Store water for beneficial consumptive uses <br />. Allow the Upper Basin states to use the apportionment made to and arr,ong them <br />throughout the Colorado River Basin Compact <br />. Provide for the reclamation of arid and semiarid land <br />. Provide for tlood control <br />. Provide for fish and wildlife enhancement and public recreation <br />. Generate hydropower <br /> <br />Need: Action is needed to lower the water surface elevation of Morrow Point Reservoir to an <br />elevation of about 7,129 feet to remove trash and debris (i.e. trees, logs and branches) from the <br />power plant intake trash racks. <br /> <br />Purpose: The purpose of the proposed action is to conduct dam and power plant maintenance <br />activities to ensure continued operation of the Aspinall Unit to meet the above authorized <br />purposes. <br /> <br />Background Information <br /> <br />Morrow Point Dam - Morrow Point Dam was completed in 1968 as part of the Aspinall Unit of <br />the Colorado River Storage Project. The dam is a double,curvature, thin wall structure. The <br />dam is no feet long at the crest with a maximum height of 468 feet above the lowest point of the <br />foundation. <br /> <br />Curecanli National Recreation Area - The Curecanti National Recreation Area includes the <br />areas surrounding Blue Mesa, Morrow Point and Crystal Reservoirs, and provides recreation for <br />over 1 million visitors annually. Administered by the National Park Service, activities include <br />boating, fishing. sightseeing. and hiking. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.