Laserfiche WebLink
<br /> 0 <br />-.. <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br />~ 0 <br /> <br />002467 <br /> <br />o Flows of 35 cfs at Platoro Reservoir and 100 cfs at the <br />Highway 17 bridge during the summer months, and natural <br />flows during winter months, were considered necessary <br />to accomplish the purposes of designation, Summer <br />flows drop below those recommended on occassion. Thus, <br />it was suggested that the Forest Service should issue <br />no further permits for water development projects on <br />its lands, <br /> <br />Acquisition of existing water rights was not <br />recommended. <br /> <br />No conflict with the Rio Grande compact was <br />anticipated. <br /> <br />Campground rehabilitation and replacement would occur, <br /> <br />Reconstruction of 25.6 miles of trail would be <br />required. <br /> <br />A Recreational Forester would be required to administer <br />the area, <br /> <br />A capital investment of $1.900,000 and an annual <br />maintenance and administrative cost of $111,000 would <br />be required. <br /> <br />Current Legislation (S, 1084) <br /> <br />S. 1084 would delete a two-mile segment below Platoro <br />Reservoir, Which was recommended for designation in the final <br />study report, This would eliminate several tracts of private <br />land from designation. <br /> <br />Ibm <br /> <br />-3- <br />