Laserfiche WebLink
<br />Proposed Management Actions <br /> <br />Exlstin& Management Alternative <br /> <br />TABLE 8-1 (Cootinued) <br /> <br />Natural Resource Enhancement <br />Alternative <br /> <br />Resource Production Enhancement <br />Alternative <br /> <br /><:::I <br />= <br /> <br />~",-'-t <br /> <br />Lands Withdrawal Managemeot <br /> <br />Preferred AJternative <br /> <br />-t <br />...... <br />00 <br /> <br />Lands Access Acquisition <br /> <br />Lands Rights-of-Way Managemeot <br /> <br />rJ1 <br />, <br />~ <br /> <br />Existing withdrawals retained; no new <br />withdrawals reconunended. <br /> <br />Directed by existing area transportation <br />plan, <br /> <br />No corridors dP-CigJ''IlltNl. <br /> <br />BLM 1ands open for consideration for <br />development of major utility facilities <br />with stipulations on a case-by-aase basis. <br /> <br />Existing withdrawals retained except <br />water storage/powersite withdrawals on <br />the wild and scenic Rio Grande River <br />proposal. If de.ignated, new withdrawal <br />would be recommended to protect these <br />river values. <br /> <br />Natural resource values would be <br />enbBnced (e.g., special plants and anim- <br />als. riparian, wildlife habitat. recreation <br />valnes.etc.), <br /> <br />No corridors designated <br /> <br />BLM lands open for consideration for <br />development of major utility facilities <br />with stipulations on a c:ase-by-case basis. <br /> <br />Special limitations: intensive recreation <br />areas; riparian areas; special plants/ <br />animals. <br /> <br />ROWs wnnld avoid all ACECs. ROWs <br />would conform to VRM objectives. <br /> <br />Existing withdrawals recommended for <br />termination; no new withdrawals <br />recommended. <br /> <br />Production resource value; would be <br />enhanced (e.g., mineral development. <br />recreation, timber sales, etc.). <br /> <br />Utility corridors would be designated per <br />WUG with one exception. <br /> <br />BLM lands open for consideration for <br />development of major utility facilities <br />with stipulations on a case-by-case basis. <br /> <br />Rio Grande River Corridor clO5Cd to <br />major utilities. <br /> <br />..._~~ <br /> <br />Existing withdrawals retained except <br />water storage/powersite withdrawals on <br />the wild and scenic Rio Grande River <br />proposal, If designated, new withdrawal <br />would be recommended to protect these <br />river values. <br /> <br />umu~ --Z <br />O' yaccess ranking criteria: e- <br />fits amI . nefits in <br />CRMAP; benefits scenic easements along <br />Rio Grande River Corridor; benefits to <br />allothen. <br /> <br />Utility corridors designated per WUG <br />except would avoid: Middle Creek area; <br />Rio Grande River Corridor; Blanca <br />WHA; riparian zones. <br /> <br />All other BLM lands open for considera- <br />tion (or development of major utility <br />facilities with stipulations on case-by~ <br />basis. <br />