My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02689
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC02689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:11:10 AM
Creation date
10/9/2006 3:30:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System-Ray
State
CO
Water Division
5
Date
8/1/1991
Author
BOR
Title
Consumptive Use Modeling-Inventory of Hydrologic Models-Global Climate Change Response Program-Excerpt
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />GGJ.jlJ <br /> <br />HYDROLOGIC MODELS INVENTORY <br /> <br />EVALUATION FORM <br /> <br />NAME OF MODEL: WMC (Water Management and Conservation) Package <br /> <br />FUNCTION: To forecast irrigation requirements of an irrigation system <br /> <br />AGENCY & OFrICE: USBR - Denver Office - Facilities Engineering Branch <br /> <br />TECHNICAL CONTACT: Dave King (D-5210) 303-236-8322 <br />FTS-776-8322 <br /> <br />MACHINE COMPATIBILITY: IBM-PC <br /> <br />DOCUMENTA~ION: User's manual available <br /> <br />SPATIAL PRECISION: Determined by user input <br /> <br />TEMPORAL PRECISION: Daily <br /> <br />OVERVIEW OF CAPABILITIES, ASSUMPTIONS: Three levels of use are available: <br />Intensive field by field scheduling, general scheduling and systemwide <br />scheduling. <br /> <br />STRENGTHS: Newer versions have numerous PC enhancements <br /> <br />WEAKNESSES: 3rd version is being developed using DBASE IV while 2nd version <br />(in BASIC) is in limbo. <br /> <br />INPUT REQUIREMENTS: Canal system data such as farm turnouts, deliveries, <br />water orders and field irrigation scheduling data. <br /> <br />OUTPUT PRODUCED: Accounting summary of system water use and forecasted water <br />use. <br /> <br />1-12 <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.