My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02678
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC02678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:20:30 AM
Creation date
10/9/2006 3:30:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/15/1989
Author
Anne DeMarsay
Title
The Brownell Task Force and the Mexican Salinity Problem - A Narrative Chronology of Events - Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Ou2162 <br /> <br />At the time of Echeverria's visit, OSW had even lobbied the <br />White House for a $140 million, 200 mgd plant at Yuma, <br />Arizona--and allowed word of it to reach The Wall Street <br />JoUrnal.10 Kissinger reportedly was intrigued by the <br />possibilities of this new technology.ll Even Echeverria <br />seemed to have caught some of the spirit; in his speech to <br />Congress, he said: "It is impossible to understand why the <br />United States does not use the same bOldness and imagination <br />that it applies to complex problems with its enemies to the <br />solution of simple problems with its friends.,,12 <br /> <br />'W' <br /> <br />When Kissinger's message reached Interior, the advocates of <br />desalting pressed their case. While Reclamation's top <br />managers were out of the country, Assistant Secretary Smith <br />decided that the Bureau should be represented on the Working <br />Group by the planning staff--which had responsibility for <br />new technologies--rather than the Water Operations staff. <br />Water Operations was responsible for overseeing operation <br />and maintenance of completed projects such as <br />Well ton-Mohawk , and administering the water users' service <br />contracts for water from these projects. Its managers <br />supported a salt balance approach. And OSW would be <br />represented by its own staff, not Reclamation's. <br /> <br />During the first week in October, Brownell and his staff <br />visited Wellton-Mohawk, toured the border area, and were <br />given an introduction to desalting technology. State and <br />Interior Task Force and Working Group members accompanied <br />them on the trip. Upon his return, Working Group Chairman <br />Sam Eaton announced that he and the Special Representative <br />had been very impressed by the promise of desalting. <br /> <br />OMB representatives on the Working Group, unaware of <br />Kissinger's order but alarmed at the growing support for a <br />desalting plant, contended that it was unnecessarily costly, <br />conflicted with the President's water pollution control <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.