My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02588
CWCB
>
Water Supply Protection
>
Backfile
>
15000-15999
>
WSPC02588
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:20:00 AM
Creation date
10/9/2006 3:27:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.750
Description
Colorado River Operations And Accounting - California 4-4 Plan
State
CA
Basin
Colorado Mainstem
Water Division
5
Date
12/17/1997
Author
1997
Title
Colorado River Board 4-4 Plan - Californias Use of Its Colorado River Allocation - Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />000522 <br /> <br />December 17, 1997 <br />DRAFT <br /> <br />accordance with state and federal law, and implementation is estimated to <br /> <br />consist of 1.5 to two years of design and other preconstruction activities <br /> <br />followed by 3.5 to four years of construction. <br /> <br /> <br />The Coachella Canal Lining Project was documented in the Bureau <br /> <br /> <br />of Reclamation's December 1993 "Draft Environmental Impact <br /> <br /> <br />Statement/Environmental Impact Report for the Coachella Canal Lining <br /> <br /> <br />Project" (EIS/EIR). The water savings of this project, estimated at 26,000 <br /> <br />acre-feet per year, are based upon the 1982-1990 observed conveyance <br /> <br /> <br />loss in the earthen reach of the Coachella Canal (Siphon 7 to Siphon 32). <br /> <br /> <br />As over three years have passed since issuance of the Draft EIS/EIR, <br /> <br />Reclamation has indicated that should the project be pursued, a revised <br /> <br />Draft EIS/EIR would have to be issued. Therefore, implementation is <br /> <br />estimated to consist of 1 year for environmental documentation, followed by <br /> <br />4 years of design and construction. <br /> <br />The proposed schedule for implementation of the firm transfers to be <br /> <br />implemented during Phase 1 of the Plan is discussed later in this document. <br /> <br />Non-firm Transfers <br /> <br />o Non-firm Transfer Aareements -- The Plan includes prearranged measures <br />to periodically move water from agricultural areas to the coastal plain to help <br /> <br />fill the Colorado River Aqueduct (e.g., land fallowing in PVID by MWD). <br /> <br />c:LI44plrv17.wpd <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.