Laserfiche WebLink
<br />. ' <br /> <br />00-):;3') . <br />\ l l.J ';.,' <br /> <br />December 17, 1997 <br />DRAFT <br /> <br />o Future liD conservationltransfer Opportunities to conserve and transfer an <br /> <br />additional 50,000 to 100,000 acre-feeUyear to the coastal plain would be <br /> <br />implemented, if determined to be feasible. <br /> <br />Non-Finn Transfers <br /> <br />o Additional Non-firm Transfers - Additional non-firm transfers will be studied <br /> <br />and implemented as needed to continue to meet the Colorado River water <br /> <br />needs of the coastal plain of southern California. <br /> <br />Reservoir Operations <br /> <br />o California will work with the Department of the Interior and the Colorado <br /> <br />River Basin states during Phase 1 to develop reservoir operating strategies <br /> <br />that will be operative during the second Phase. <br /> <br />Schedule <br /> <br />The implementation schedule for the various elements of the Plan is being <br /> <br />developed. The implementation schedule for the firm transfers to be implemented during <br /> <br />Phase 1 is contained in Attachment 3. <br /> <br />c:LI44plrv17.wpd <br /> <br />19 <br />