Laserfiche WebLink
<br />~~202S <br /> <br />. <br /> <br /> <br />Photograph - 1 Hogback Canal, Test Pond No.1, downstream <br />earth dam covered with 20 mil PVC plastic, ready for <br />filling. <br /> <br />. <br /> <br /> <br />Photograph - 2 Field <br />adjacent to Hogback Canal <br />with drainage problems. <br />Seepage water evident at <br />surface. South side of <br />canal, 2.5 miles from <br />diversion. <br /> <br />. <br /> <br />3 <br />