Laserfiche WebLink
<br />Hydrology Study <br />Team Formed <br /> <br />On January 16, Reclamation an- <br />nounced the formation of a hydrology <br />~tudy learn for the evaluation (If exist- <br />ing Reclamation Platle Ri\'cr Projects <br />and scheduled the fitslleam meeting <br />for February 12 and 13. This team of <br />technical specialists .....;11 prmiJc input <br />and support of hydrology .....ork thaI is <br />coru;idcrcd KC)'IO anaJ)7ing the ef. <br />feels of facility opt:ration on <br />threatened and endangered species. <br /> <br />Hydwlogy learn leader Duane <br />Woodward ~id Reclamation plans to <br />develop prcdicti..,c monthly waler <br />operation studies (or the North <br />Pblle. Soulh Plaue and Platte Rivers <br />that can be u~d 10 anal)7.c changes in <br />Oows and habitat .."alues in the <br />riverine em-ironment. The plans for <br />developing operation study analysis <br />include updating and'or modifying ex. <br />isting analysis. Reclamation has <br />re\icwed the North Platte River <br />Simulation Model developed by the <br />Wyoming Water Dn-elopment Com- <br />mir.sion and is in the linal stages of <br />purcha....ing the model for develop- <br />ment and u.-.e by the team. <br /> <br />The pur~ of the hydrology <br />study team is to provide technical <br />input and as.....ist in developing a <br />hydrologic analysis that ha.c; a ....ide <br />basis of underslanding and accept- <br />ability among the various intcrcst <br />groups. The tcchnical input, for ex- <br />ample, may include hydrologic data, <br />new or improo.'Cd methods for an <br />analysis., or definition of exi....ting <br />waler resource uses. The hydrology <br />team ""ill ha\'C the opportunity to <br />re\iew ami become familiar with exi.!.t- <br />ing analy!.is, proo.ide input to de\'elop- <br />ing the hydrologic analysis, and <br />comment on the ....Titeups for the <br />developed analysis. <br /> <br />Hydrology Study <br />Team Meeting <br /> <br />The fint meeting of the Hydrology <br />StudvTeam was February 12 and 13, <br />atth~ North PlaHe River Projects Of- <br />fice in Mills, Wyoming. The learn is <br /> <br />. <br /> <br />. <br /> <br /> <br />There aft' 30 indil'idllaJs , representinK sel'era[ Q~ncies and illlerest grollpS, par- <br />ticiputingon the I~rdrol~' Study Team. <br /> <br />prescntly comprised of 30 indi\iduals <br />representing several federal and state <br />agencies. con.!.ervation and wildlife or- <br />ganil'..ations, and watcr users (see list <br />of ~tudy participants on follo""ing <br />page). <br /> <br />The hydrology sludy team <br />re..iewed and became familiar ....ith <br />the currenl operations and wall'r ac- <br />counling requirement for the North <br />Plane pruje(;ts. There wa<; consider- <br />able discu.....c;ion and agreement con- <br />cerning the need for developing an <br />llpcration modclthat ....ill have the <br />Ocxibility to evaluate a ....ide array of <br />operational alternatives. The team <br />decided that the model should; <br />I) simulate present reservoir opera- <br />tions. 2) have nexihility to set changes <br />in resc('mir operations, J) make diver. <br />sions for prescnt water u.-.es from the <br />river according to .....ater rig.hl priority <br />and decree allocations, ~) utilize in. <br />noW'S and gains thai reOeet present <br />basin development, and 5) use a <br />ground....ater rcturn now function that <br />changes ""ith surface ....ater dcli...eric..... <br />The team also discu~..cd the pO!io.sil:>1c <br />nced for a daily operation analysis and <br />the prescnt condition channel m(1(- <br />phology analysis. <br /> <br />Prior (0 the ncxt stuu\-tcam meel- <br />ing, Reclamation will de~-clop the <br />ofll,'ration slUuy peril>U. analp-t' in. <br />00\'\'"5 and g.3ins to detcrmine prescnt <br /> <br />.....ater supply conJilions, and linalizc <br />purchase of the North Plauc River <br />Simulation Model and distribute user <br />manuals to the study team. These <br />items ""ill be disc~d at the next <br />hydrology study team meeting set for <br />May 22. 1991 in Denver. CO. <br /> <br />Questions and <br />Comments <br /> <br />The c\'aluation to determinc iflhe <br />operations of Reclamation facilities in <br />the Plaue River Ba...in arc in com- <br />pliance ....ith the Endangered Species <br />Act is I:>cing led by (he North PiaUI.' <br />River Projects Office. Any questions <br />or comments regarding the evaluation <br />should be directed 10: <br /> <br />Slud~ Managrr <br />Ddllolz <br />North PlaUe Rhrr Projt"('ts <br />P.O. 8m. 16.'0 <br />~1ills W'f "16-1~-I6.'O <br />(307) 261-569.' <br /> <br />-(lr- <br /> <br />Prujt"l'1 ~Ianager <br />John II. LaMson <br />l"lorth Platte Ri'er Projt"('ts <br />P.O. ROll. 16.'0 <br />.\liII!> WY 826-14.16..'0 <br />(.'07) 261.5ti71 <br />