My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02244
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC02244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:17:49 AM
Creation date
10/9/2006 3:16:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09.C
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1993
Author
BOR-NPS
Title
Legislation to Make BC a National Park-Scoping Report for the Gunnison River Contract
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER 5. FUTURE NEPA AND PUBLIC INVOLVEMENT ACTIVITIES <br /> <br />The expanded scope of this project must be clearly defmed and reflected by development of <br />concise statements of the proposed action and the need for and purpose of the action. <br />Responsibilities of the joint-lead and cooperating agencies need to be identified. Tasks and a <br />revised schedule for completion of NEPA document preparation need to be developed. Data <br />collection and research needs must be identified and coordinated. Concurrently, the public <br />involvement plan for this project should be updated. <br /> <br />Beginning with a mailing to highlight the scoping results, newsletters will be used to infonn the <br />public of progress and opporfunities for further involvement through the NEPA analysis and <br />contract development processes. For example, during the fonnulation of alternatives phase, a <br />newsletter would be used to infonn the general mailing list of alternatives developed as a result <br />of scoping, internal infonnation, and interagency team work. The newsletter would explain the <br />array of alternatives under consideration, the process and criteria used to reduce and consolidate <br />the list. If public meetings are planned to discuss the alternatives, a newsletter would notify the <br />public of opportunities to participate in such meetings. At a minimum, such public meetings <br />would be held in Gunnison, Montrose, and Delta, Colorado. <br /> <br />Newsletters will also be used as necessary to invite public participation and support of the <br />involved agencies throughout the NEPA and contract development processes. These include <br />detennining data needs, developing study plans, detennining analysis methods, conducting <br />studies, evaluating alternatives, and analyzing environmental impacts. <br /> <br />Any fonnal contract negotiation sessions will be also open to observation and comment by the <br />public. <br /> <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.