Laserfiche WebLink
<br />OJ0229 <br /> <br />18 <br /> <br />ELEr1ENT TASI(S A-3,lO THROUGH A-3,16 and ELEMENT TASKS A-I,ll and A-l.12 <br /> <br />These tasks as clarified by subsequent meetings wi th the general contractor and <br />the state are as follows: <br />CONSTRUCT FOUR INPUT-OUTPUT MODELS IN TilE EASTERN IIIGH PLAINS OF <br />COLORADO TO I~EASuriE AND PROJECT TilE ECONOH1C H-lPJ\CTS OF AL TEIlNATlVE <br />DEVELOPMENT STRATEGIES FOR TilE OGALLALA A~JIFER AND USE THE EXISTING <br />COLORADO INPUT-OUTPUT MODEL TO MEASURE IMPACTS FOR REGIONS OF THE <br />STATE OUTSIDE THE AREA, <br /> <br />~Jle s c r i.pt i a.Q_aL...s~_ b!~2.k.s, <br />The subtask cansists of a majar and a minar camponent, The major companent <br />requires the canstructian af faur input-autput madels to. praject incame, output, <br />\'wter use, energy use and emplayment by economic secl:or l'li thin the study <br />region, In addition, the models must provide detailed prajections of lacal <br />gavernment receipts and expenditures and prajectians of ather required lacal <br />sacial services, The minar camponent invalves the usp. of the existing 1970 <br />input-output madel far thp. State af Colorado to. measure the impact af changes <br />in the study regian on the remainder of the state, <br />Data win be conected on a co.unty by co.unty Gasis so. that var'io.us <br />aggregatians af caunties may be achieved to. meet the needs af the regianal <br />contractar and to meet the needs af lacal governmental planning units (such <br />as regianal councils of gavernments) and to fit within three state planning <br />regians which are affected, To. achieve the latter purpase, five caunties <br />nat'directly underlain by the aquifer will be included, State Planning regian 1 <br />includes: nargan,* Lagan, Sedgwick, Phillips and Yuma counties, State Planning <br />