Laserfiche WebLink
<br />0002~:7 <br /> <br />16 <br /> <br />ELEMENT A-l ,10: ANALYSIS OF DEMAND FOR IMPORTED WATER AND <br />PREPARATION OF FINAL REPORT ON DIRECT ECONOMIC IMPACT ANALYSIS <br /> <br />A, Task Description <br />As noted above in A-l,2, the projection models would require reformulation <br />to properly measure payment capacity for imported water, Thi s sub-task woul d <br />include the reformulation of models for this purpose, performing the com- <br />puter analysis and preparing and interpreting the results, <br />The sub-task would also include preparation of the final report on <br />the analysis of direct economic impacts, <br /> <br />B, Duration and Personl1e1~ire]J!.P,-~~ <br /> <br /> <br />1. Duration 4,0 months (September 1-December 31, 1980) <br /> <br /> <br />2, Personnel <br /> <br />(a) Senior agricul tural economist, 1.5 mon ths , <br />(b) Junior agricultural economist, 3,0 months, <br />(c) Graduate assistants, 3,0 months, <br /> <br />C, Inputs and Outputs <br />1, Inputs would come from Task A-l,8, A-2, A-3 and from Elements B-1, <br />8-8, 11-9 and ll-ll. <br />2, Outputs <br />(a) Projection of demand for supplemental water (to B-11), <br />(b) Final report and documentation, <br />(c) Consultation with HPA and state agency officials regarding <br />interpretation of results and conclusions, <br />