Laserfiche WebLink
<br />OJG846 <br /> <br />Annual Costs <br /> <br />Debt <br />11,893,868 x .08838 <br /> <br />Management <br />185,500 x 18,768/133,200 <br />Total Annual Cost <br />Annual Cost per Acre-foot (18,768) <br />Annual Cost per 1,000 gallons <br /> <br />RAWLINS <br /> <br />Construction Costs <br /> <br />Upper Savery and Three Forks <br />84,163,000 x 7,500/133,200 <br /> <br />Hydroelectric <br />3,648,646 x 7,500/114,432 <br /> <br />Pipeline (66 inch) <br />56,308,560 x 7,500/114,432 <br /> <br />Pipeline (48 inch) <br />38,269,440 x 7,500/114,432 x 15/48.5 <br /> <br />Pump Stations, Gaging, Electric <br />(14,021,760 + 2,346,000 + 75,000) 7,500/114,432 <br /> <br />EIS <br />250,000 x 7,500/133,200 <br />Total <br /> <br />Annual Costs <br /> <br />Debt <br />10,536,062 x .08838 <br /> <br />Management <br />185,500 x 7,500/133,200 <br /> <br />Power, Pump Repairs, O&M <br />(41,594,147 + 240,900 + 3,981,648) 7,500/114,432 <br /> <br />Power Revenues <br />1,243,590 x 7,500/114,432 <br />Total Annual Cost <br />Annual Cost per Acre-foot (7,500) <br />Annual Cost per 1,000 gallons <br /> <br />lI! <br /> <br />$ 1,051,180 <br /> <br />26,137 <br />$ 1,077 ,317 <br />$ 57.40 <br />$ .18 <br /> <br />$ 4,738,908 <br /> <br />239,136 <br /> <br />3,690,525 <br /> <br />775,739 <br /> <br />1,077 ,677 <br /> <br />14,077 <br />$10,536,062 <br /> <br />$ 931,177 <br /> 10,445 <br /> 3,002,877 <br /> (81,506) <br />$ 3,862,993 <br /> $515.06 <br /> $ 1.58 <br /> <br />