Laserfiche WebLink
<br />. . ' <br /> <br />000831 <br /> <br />4) Reservoir to Atlantic Rim Delivery System <br />(82 cfs) <br />$184,481/cfs <br /> <br />Rawlins: <br />a) Sage Creek Delivery <br /> 9 cfs x $184,481 = $ 1,660,325 <br />b) Import Delivery <br /> 31.3 cfs x $184,481= $ 5,774,243 <br />Other Users: <br /> 41. 7 cfs x $184,481 = $ 7,692,841 <br /> <br />5) Rawlins to Platte River Delivery System <br />22,500 acre-feet <br />$267/acre-foot <br /> <br />6) EIS (30,000 acre-feet) <br />$16.67/acre-foot <br />Rawlins: 7,500 x $16.67 = $ <br />Other Users: 22,500 x $16.67 = $ <br /> <br />125,000 <br />375,000 <br /> <br />Cost Totals <br /> <br />Rawlins: <br />a) Sage Creek Water <br />b) Import Water <br />Other Users: <br /> <br />$ 4,394,042 <br />$25,443,200 <br />$72,707,283 <br /> <br />Annual Costs <br /> <br />Rawlins: <br />a) Sage Creek Water <br />$4,394,142 x .08838 <br />+4,394,042 x .02 <br />$476,225 <br />Annual Cost per <br />Annual Cost per <br /> <br />Total Annual Cost <br />Acre-foot $476,225 . <br />1,000 gallons $79.37 <br /> <br />6,000 <br />~ 325.8 <br /> <br />$ 15,127,409 <br /> <br />$ 6,007,570 <br /> <br />$ <br /> <br />500,000 <br /> <br />$ <br />$ <br />$ <br /> <br />476,225 <br />79.37 <br />.24 <br /> <br />Note: The projected cost for Rawlins to replace their existing line to <br />deliver 6,000 acre-feet per year is $6,411,407 plus reservoir enlargement <br />costs. <br /> <br />b) Imported Water <br />$25,443,200 x .08838 <br />+ 25,443,200 x .02 <br />+ 751,666 x 7500/30,000 <br />$2,945,451 Total Annual Cost <br />Annual Cost per Acre-foot $2,945,451 ~ 7500 <br />Annual Cost per 1,000 gallons $392.73: 325.8 <br /> <br />14 <br /> <br />$ 2,945,451 <br />$ 392.73 <br />$ 1. 21 <br /> <br />;-':, ; <br />