Laserfiche WebLink
<br />.Oi 1457 <br /> <br />UTE MOUNTAIN UTE LA PLATA WATERSHED <br /> <br />.:..,} 0" . <br /> <br />TABLE D.l <br />PIPELINE COSTS <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Pipe <br />Diamet. <br />(inch) <br /> <br />4 <br />6 <br />8 <br />10 <br />12 <br />14 <br />15 <br />16 <br />18 <br />20 <br />21 <br />24 <br />27 <br />30 <br />33 <br />36 <br /> <br /> y <br /> Installed Cost - $/ft <br />100 150 200 250 300 350 <br />psi psi psi psi psi psi <br />10.50 11.00 11. 50 12.00 12.50 13.00 <br />12.00 12.50 13.00 14.00 14.50 15.00 <br />15.50 16.00 17.00 17.50 18.50 20.00 <br />20.00 21.00 22.50 23.50 25.00 26.50 <br />24.00 26.50 28.50 31.00 33.00 35.00 <br />28.50 32.00 35.00 38.00 41. 00 44.00 <br />31.00 34.50 38.50 42.50 45.50 49.00 <br />34.00 37.50 42.00 46.00 50.00 54.00 <br />41. 00 45.00 50.00 54.00 59.50 65.00 <br />48.50 53.00 58.00 63.50 69.00 75.00 <br />50.50 55.50 60.50 66.00 71. 50 77.00 <br />62.00 69.00 75.50 82.00 88.50 95.50 <br />75.50 82.00 88.50 96.50 104.00 112.00 <br />89.50 96.50 103.00 111.00 120.00 128.50 <br />104.50 Ill. 00 116.50 126.50 137.50 148.50 <br />115.50 122.00 130.50 142.00 155.00 166.00 <br /> <br />l/ Unit construction cost including 10% allowance for <br />appurtenances. <br /> <br />6 <br />