My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC02026
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC02026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:16:10 AM
Creation date
10/9/2006 3:08:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.700
Description
Colorado River Basin General Publications - Augmentation-Weather Modification
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/2/1983
Title
Preliminary Evaluation of the Ongoing Salinity Control and Related Programs in the Colorado River Basin
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />000057 <br /> <br />CONTENTS <br /> <br />CRSS simulation <br />Reservoir studies <br />Solute trend study <br /> <br />Page <br />1 <br />3 <br />7 <br />7 <br />8 <br />8 <br />9 <br />basin <br />9 <br />12 <br />12 <br />13 <br />13 <br />15 <br />15 <br />15 <br />18 <br /> <br />Introduction <br /> <br />CRWQIP Unit Appraisals <br /> <br />.' <br /> <br />Major Issues and Concerns <br /> <br />Reclamation'sWQIP. . <br />BLM WQIP . . . . . . . <br />USDA WQI P ... . .. ..... <br />Non-Federal salinity control activities .. <br />Colorado River enhanced snowpack test and full <br />operational pro9ram - Reclamation. <br />WQIP construction schedules <br />Cost effectiveness <br /> <br />I . <br /> <br />Pro9ram overview <br /> <br />Findings <br />Conc 1 us ions <br /> <br />FIGURES <br /> <br />Figure <br /> <br />1 Recorded salinity levels at Imperial Dam, <br />with projections through the year 2010 <br /> <br />2 WQIP construction schedule for CRSS projections <br /> <br />3 Relative cost effectiveness and salt reduction at <br />Imperial Dam for Title II Projects <br /> <br />4 <br /> <br />. <br /> <br />Relative cost effectiveness and salt reduction at <br />Imperial Dam for SCS, BLM <br /> <br />5 Relative cost effectiveness and salt reduction at <br />Imperial Dam for CREST Program <br /> <br />6 1995 projection windows - TDS at Imperial Dam <br />7 CRSS salinity projections (bar graph) <br /> <br />8 Projected Upper Basin depletion schedules <br /> <br /> <br />9 Salinity at Imperial Dam CRSS average projections (line graph) <br /> <br /> <br />10 Probability of exceeding salinity level WD WQIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.