Laserfiche WebLink
<br />000057 <br /> <br />CONTENTS <br /> <br />CRSS simulation <br />Reservoir studies <br />Solute trend study <br /> <br />Page <br />1 <br />3 <br />7 <br />7 <br />8 <br />8 <br />9 <br />basin <br />9 <br />12 <br />12 <br />13 <br />13 <br />15 <br />15 <br />15 <br />18 <br /> <br />Introduction <br /> <br />CRWQIP Unit Appraisals <br /> <br />.' <br /> <br />Major Issues and Concerns <br /> <br />Reclamation'sWQIP. . <br />BLM WQIP . . . . . . . <br />USDA WQI P ... . .. ..... <br />Non-Federal salinity control activities .. <br />Colorado River enhanced snowpack test and full <br />operational pro9ram - Reclamation. <br />WQIP construction schedules <br />Cost effectiveness <br /> <br />I . <br /> <br />Pro9ram overview <br /> <br />Findings <br />Conc 1 us ions <br /> <br />FIGURES <br /> <br />Figure <br /> <br />1 Recorded salinity levels at Imperial Dam, <br />with projections through the year 2010 <br /> <br />2 WQIP construction schedule for CRSS projections <br /> <br />3 Relative cost effectiveness and salt reduction at <br />Imperial Dam for Title II Projects <br /> <br />4 <br /> <br />. <br /> <br />Relative cost effectiveness and salt reduction at <br />Imperial Dam for SCS, BLM <br /> <br />5 Relative cost effectiveness and salt reduction at <br />Imperial Dam for CREST Program <br /> <br />6 1995 projection windows - TDS at Imperial Dam <br />7 CRSS salinity projections (bar graph) <br /> <br />8 Projected Upper Basin depletion schedules <br /> <br /> <br />9 Salinity at Imperial Dam CRSS average projections (line graph) <br /> <br /> <br />10 Probability of exceeding salinity level WD WQIP <br />