Laserfiche WebLink
<br /> 6 <br />I June 1970 <br /> Norton Drain Project (cont.) <br />I Struct. & Loc. Description Quantity Unit Unit Cost Extendon <br /> 19 266+40 108" CMP Hwy x-ing 1 1.8. 4800.00 10,800.00 <br />I 19A Double 108" P check structure 1 1.s. 21000.00 2,1000.00 <br /> (Ilasmussen) <br /> 20 307+77 24" P Smooth Flo x-ing 72 1.f. 10.00 720.00 <br />I Concrete 1.6 c.y. 100.00 160.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br /> 21 309+45 Double 108" P check structure 1 1.s. 21000.00 2,1000.00 <br />I 108" P CMP 106 1.f. 15.00 690.00 <br /> 22 319+82 108" P CMP 1108 1. f. 15.00 2,220.00 <br />I 23 333+00 Double 108" p drop structure 1 1.s. 2300.00 2,300.00 <br />210 2105+97 108" p CM!' 92 1.f. 15.00 ' 1,380.00 <br />I 214 108" fl CMP (Barr) 80 l.f. 15.00 1,200.00 <br /> 210" f5 Smooth Flo x-ing 910 1.f. 10.00 9100.00 <br /> Concrete 1.6 c.y. 100.00 160.00 <br />I 25 359+29 24" P Smooth Flo x-ing 710 1. f. 10.00 7100.00 <br /> Concrete 1.6 c.y. 100.00 160.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br />I 26 378+410 Double 108" p drop structure 1 1.B. 2300.00 2,300.00 <br />27 398+12 24" P Smooth Flo x-ing 60 1.f. 10.00 600.00 <br /> Concrete 1.6 c.y. 100.00 160.00 <br />I Cutoff collars 1 pair 70.00 70.00 <br /> 24" P CMP extension 20 1.f. 8.00 160.00 <br /> 27A 108" P CMP x-ing (Christensen) 80 1.f. 15.00 1,200.00 <br /> 28 1011+39 24" p Smooth Flo x-ing 73 1.f. 10.00 730.00 <br /> Concrste 1.6 c.y. 100.00 160.00 <br /> Cutoff collars 1 pair 70.00 70.00 <br /> 29 1027+00 Double 48" p drop s truc ture 1 1.8. 2300.00 2,300.00 <br /> 29A 48" P CMP x-ing (Holman) 72 1.f. 15.00 1,080.00 <br /> 30 1044+51 18" Smooth Flo x-ing 66 1.f. 9.50 627.00 <br /> Concrete 1.3 c.y. 100.00 130.00 <br /> Cutoff collaTS 1 pair 70.00 70.00 <br /> 31 1050+00 48" p CMP 256 1.f. 15.00 3,840.00 <br /> 32 1051+53 108" P CMP 140 1.f. 15.00 2,100.00 <br /> 12" P field drops 40 each 270.00 10,800.00 <br /> 12" P vert borrow pit drops 2 each 100.00 200.00 <br /> Excavation 2810,391 c.y. 0.25 71,097.75 <br /> Riprep 1,033 e,y, 10.00 10,330.00 <br /> 12" P CMP pipe extensions 4210 1.f. 6.00 2,51010.00 <br /> Well protection 2 each 1000.00 2,000.00 <br /> Subtota 1 for Main Branch 147,866.25 <br /> Construction Total for Project 8 176,857.00 <br /> 0566 <br /> <br />