My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01976
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:15:46 AM
Creation date
10/9/2006 3:06:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272
Description
Colorado River - Colorado River Basin Salinity Control Program - CRBSCP
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1991
Author
Anne DeMarsay
Title
Brownell Task Force and the Mexican Salinity Problem - A Narrative Chronology of Events
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />.- <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.e <br />I <br /> <br />C- "'72 <br />~ (,1.). . <br /> <br />. Why have no provisions been made for permanent replacement of water lost in <br />the effluent (brine) stream from the desalting plant? <br /> <br />· Where will the Federal government obtain power to run the desalting plant? <br /> <br />. Will the desalting plant work?24 <br /> <br />To the first three questions, P.L. 93-320 (based on H.R. 12165), provided partial answers. Title <br />II, authorizing a basin-wide salinity control program, was added, though the Executive Branch <br />has never shown any enthusiasm for funding the projects in the program. The Congress <br />declared in the Act that replacement of the brine stream from the desalting plant was a national <br />obligation, but was silent on possible sources of replacement water. (The Federal government <br />does not, in fact, own any water in the Colorado River Basin.) It further declared that use of <br />power for the desalting plant and other Title I works must not diminish the supply available to <br />preference customers, but again failed to specify power sources (although these were later <br />identified by the Bureau of Reclamation). <br /> <br />Seventeen years later, the answer to the last question is still unknown. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.