Laserfiche WebLink
<br />, <br /> <br />$ 1,026.00 <br /> 390.00 <br /> 255.00 <br /> 480.00 <br /> 720.00 <br /> $ 2,871.00 <br />$ 90.00 <br /> 600.00 <br /> 960.00 <br /> 660.00 <br /> 2,930.00 <br /> $ 5,240.00 <br /> <br />uJ2G-t8 <br /> <br />.' <br /> <br />PROTECTIVE COSTS <br /> <br />Sandbcgging <br /> <br />June 10, 1985: <br /> <br />Manpower - 76 hrs. @$13.50 <br />Pickups - 19.5 hrs. @$20.00 <br />Loader - 3 hrs. ?$B5.00 <br />Trucks - 12 hrs. @$40.00 <br />Materials - Sandbags <br /> <br />June 11, 1985: <br /> <br />Manpower - 90 hrs. @$lO.OO <br />Pickups - 30 hrs. @$20.00 <br />Trucks - 24 hrs. @$40.00 <br />Backhoe - 12 hrs. @$55.00 <br />Materials - Sandbags <br /> <br />June 12, 1985: <br /> <br />Manpower - 26 hrs. @$10.00 <br />Loader - 2 hrs_ @$85.00 <br />Trucks - 4 hrs. ~$40.00 <br />Pickups - 4 hrs. @$20.00 <br /> <br />$ <br /> <br />260.00 <br />170.00 <br />160.00 <br />BO.OO <br /> <br />TOTAL SANDBAGGING: <br /> <br />$ 670.00 <br /> <br />$ <br /> <br />8,781.00 <br />