<br />IS?
<br />'--1
<br />('I') 5. CONSTRUCTION COSTS.
<br />.-I
<br />
<br />distributed by States, as follows:
<br />
<br />Arizona $1,071,000,000
<br />California 28,000,000
<br />Nevada 17,000,000
<br />Sum $1,116,000,000
<br />Transmission Grid 192,000,000
<br />Sub-Total, States of Lower Division
<br />
<br />Colorado $480,000,000 (7)
<br />New Mexico 55,000,000
<br />Utah 371,000,000
<br />Wyoming 55.000,000
<br />Sum $ 961,000,000
<br />Transmission Grid 170.000,000
<br />Sub-Total, States of Upper Division
<br />Total, Colorado River Basin
<br />
<br />$1,308,000,000
<br />
<br />$1,131,000 000
<br />$2,439,000,000
<br />
<br />Note (7): Total construction cost in Colorado, reported at
<br />$480,000,000, probably should be decreased about $20,000,000, in order to
<br />exclude the San Juan-Chama export diversion project which is for New Mex-
<br />ico, but is wrongly charged to Colorado. Segregations of projects listed
<br />for Colorado show:
<br />Irrigation projects in Western Colorado
<br />Power and other projects (do)
<br />Export diversions for Eastern Colorado
<br />Sum
<br />(a) of which Echo Park, cost $43,000,000,
<br />located on Green River at Utah boundary.
<br />(b) Exclusive of facilities for diverting water from one
<br />division to another within the natural basin of the Colorado River, which
<br />should be included among the irrigation costs and not summarized with ex-
<br />port diversions. Contrary to statements of the authors and to foot-note
<br />inferences of the Report, the costs of power and irrigation facilities in
<br />importing basins of Gunnison-Arkansas and Blue-South Platte projects are
<br />included in the reported export diversion costs.
<br />
<br />$107,300,000
<br />109,100,000 (a)
<br />243,500,000 (b)
<br />$459/900,000
<br />is largest project,
<br />
<br />Segregations of costs as between power, irrigation and other
<br />projects in the Colorado River Basin are not shown in the Report. However,
<br />from summaries appearing in the Report it is possible to make approx:1ma.te
<br />segregations as follows:
<br />
<br />(7)
<br />
|