My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01895
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:15:05 AM
Creation date
10/9/2006 3:04:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System-Ray
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/14/1994
Title
Project Management-CRDSS Year 1 Tasks and Subtasks-Summary
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/ <br />, <br />/ <br /> <br />5EP-14-1994 15:14 FROM RIVERSIDE TECHNOLOGY,INC <br /> <br />TO <br /> <br />13038664474275 P.02 <br /> <br />Task 1.05 . Design and Implementation Coordination (May 8 - January 1) <br />S,:!<\v-. <br />1. Revise.Sdflwam Integration Team Membership (May 8 . September 1) <br /> <br />. SIT should be complete. <br /> <br />2. Evaluate and Purchase QUI Builder Software (May 8 - July I) <br /> <br />. XVT purchased and in use. <br /> <br />3. <br /> <br />Adopt Design Standards (May 8 . July 1) <br /> <br />4. <br /> <br />. Standards are in place and are being used for documentation, revision control, and <br />development. Standards are 90% established. 1 <br /> <br />~' J>'''''J' <br />Coordinate DMIDevelopment (May 29. January 1) -,::'- 0 0..~ <br />}-. /,~. <br />/" ,,,: <br />. Several DMI task memos have been finalized: and severllt-more are in draft form. Work is <br />proceeding on low.level DMIs (20% complete) and the DMI utilities (10% complete). <br />'-- ~,~ ~ ~ <br />Coordinate OUI Development (May 29 - January I) '1 <br />-\!:> ~ <br />. OUIs for MODSIM and AOP are 90~_~0r:c;omPlete. The visual data browser GUI is <br />90% complete. The CU model GUI\.uses the visual data browser. The main CROSS OU! <br />has been delayed to allow the AOP development to go faster. The development of CRSM <br />interface has not started. <br /> <br />5. <br /> <br />6. <br /> <br />Coordinate Implementation of General Software Tools (May 29 . January I) <br /> <br />. Security checks are an ongoing process. Overall security procedures are in place. <br /> <br />7. Develop CRDSS Interface (May 29. January I) <br /> <br />. The crdss program runs all CRDSS software, with the exception of the CRDSS OUI and <br />extensive Informix utilities. The script is 60% complete; the QUI is 10% compLete. <br /> <br />8. Software Integration Team Meetings (May 8 - January I) <br /> <br />. Ongoing process. <br /> <br />9. Prototype Updating (May 29. January 1) <br /> <br />. Ongoing process.. Percent completed is dependent on percent of Subtask 7 percent <br />completed. <br /> <br />1519 <br /> <br />A21S U9fiU <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.