My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01857
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:14:42 AM
Creation date
10/9/2006 3:03:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09.C
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1992
Author
BOR-NPS-BLM
Title
Legislation to Make BC a National Park-Task Directive to Prepare an EIS for Aspinal/Black Canyon Contract
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />" . ' . . . <br />Agency selection of preferred Sept 24 BOR NPS BLM <br />31~~rnative(s) CWCB, <br />Prepare draft EA/EIS and Dec 1993 BOR NPS BLM <br />summary documents <br />Agency review of draft EA/EIS Feb 1994 BOR NPS BLM ~i <br />At Field Region Washington CWCB ''11 <br />level comments to BOR (lI ; <br /> N <br />Incorporate review comments Mar 1994 BOR ~i <br />send draft EA/EIS to agencies \j <br />Final EA/ElS Apr 1994 BOR BLM NPS <br /> CWCB 1 <br />Contract Negotiation Session Apr 1994 BOR NPS BLM <br /> CWCB .0 <br /> <br />OTHER CONSIDERATIONS IF EIS IS REQUIRED <br /> <br />60-day public review <br />30-60-day extension period <br />Analyze public comment <br />Prepare public review and comment document <br />Revise EIS, preferred alternative if necessary <br />Prepare final EIS <br />Agency review (Park/Field Office/BOR, BLM; Region; Washington Office) of final <br />EIS <br />Incorporate review comments, revise final EIS <br />DOI/OEA review of final EIS <br />Revise final EIS based on OEA comments <br />Recheck by OEA of final EIS <br />Print final EIS <br />Prepare NOA of final ElS for publication in Federa/ Register <br />Transmit draft ElS to WASO for transmittal to EPA; send to Congress; release for <br />public review <br />3D-day waiting period <br />Prepare draft ROD <br />Review/approval of ROD <br />Prepare NOA of ROD for publication in Federa/ Register <br />Release ROD to public <br /> <br />?eA,~ 7 ~5i.L!~L___ <br />"'""'-- Cn-I-"....::T '? <br /> <br />13 <br /> <br />001019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.