My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01857
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:14:42 AM
Creation date
10/9/2006 3:03:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09.C
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1992
Author
BOR-NPS-BLM
Title
Legislation to Make BC a National Park-Task Directive to Prepare an EIS for Aspinal/Black Canyon Contract
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />10, <br /> <br />Participate in the development of the Upper Gunnison Basin <br />plal1nirg model. <br /> <br />11, <br /> <br />Provide technical capabilities in the area of federal land <br />management. <br /> <br />THE BUREAU OF LAND MANAGEMENT WILL: <br /> <br />1, <br /> <br />Identify Allan Belt as the BLM principal coordinator between BaR, <br />NPS and CWCB, <br /> <br />2. <br /> <br />Assist in the preparation and implementation of a Task Directive, <br /> <br />3, <br /> <br />Provide information and assistance to the BOR for the BLM <br />participation in public involvement. <br /> <br />4. <br /> <br />Provide advice and assistance in National Environmental Policy Act <br />and other compliance processes and procedures through Roger <br />Alexander, Gunnison Basin District Office. <br /> <br />5, <br /> <br />Provide written input for all documents and review materials <br />within time frames set, <br /> <br />6, <br /> <br />Review and comment on all draft documents and public <br />information materials, <br /> <br />7, <br /> <br />Provide appropriate existing data and analyses. <br /> <br />8, <br /> <br />Provide own funding for staffing, travel, an other <br />participatory needs, <br /> <br />9, <br /> <br />Provide work plans and statements of work for any necessary <br />studies, Provide draft copies for other agency review, <br /> <br />10. <br /> <br />Participate in the development of the Upper Gunnison Basin <br />planning model. <br /> <br />11. <br /> <br />Provide technical capabilities in the area of federal land <br />management. <br /> <br />12. <br /> <br />Provide GIS assistance to the other agencies. <br /> <br />8 <br /> <br />001014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.