Laserfiche WebLink
<br />OD23J3 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Canal Lining Status <br /> <br />Reclamation is proceeding with a feasibility-level investigation of the lining program <br />under a concept whereby the Association would construct the facilities using a force <br />account approach and agree to cost share a portion of the construction costs through an <br />R&B loan. The investigation will also examine the possibility of allocating some of the <br />costs to a beneficiary of the salvaged water resulting from the lining program. <br />Completion of this investigation is scheduled for September 1992. This concept is <br />supported by the Association. The appraisal-level analysis of this concept indicated that <br />a cost effectiveness in the range of $80 to $90 per ton could possibly be attained <br /> <br />10 <br />