Laserfiche WebLink
<br />002116 <br /> <br />, <br />r <br />" <br />Ii <br /> <br />Cost Estimate: <br /> <br />Old material on site, 775 cu. yds. at 6.00 <br />New material hauled to site, 781 w, yds. at <br />Repair ditch headgate <br /> <br />= 4,650 <br />40.00 = 31,240 <br />= lO,OOO <br />Total $45,890 <br /> <br />Recommendation: <br /> <br />The team concurs that the levee should be repaired and that <br />the problem at the inlet to the Del Norte town ditch should be <br />corrected before next spring runoff. It is our understanding <br />from the Soil Conservation Service that the Rio Grande Canal <br />Company intends to make the necessary repairs. It is recommended <br />that the inlet to the Del Norte town ditch be improved at the <br />same time the levee is repaired. <br /> <br />1. <br />f <br /> <br />I <br /> <br />I <br /> <br />~ <br /> <br />~ <br /> <br />28 <br />