My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01611
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:59 AM
Creation date
10/9/2006 2:51:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
CO Dept of Law
Title
Agricultural Engineering Study - San Juan East Watershed - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1412 <br /> <br />SAN JUAN EAST WATERSHED <br /> <br />TABLE D.l <br />PIPELINE COSTS <br /> <br /> y <br />Pipe Installed Cost - $/ft <br />Diarnet. 100 150 200 250 300 350 <br />(inch) psi psi psi psi psi psi <br />4 10.50 11.00 11.50 12.00 12.50 13.00 <br />6 12.00 12.50 13,00 14.00 14.50 15.00 <br />8 15.50 16.00 17.00 17.50 18.50 20.00 <br />10 20.00 21.00 22.50 23.50 25.00 26.50 <br />12 24.00 26.50 28.50 31.00 33.00 35.00 <br />14 28.50 32.00 35.00 38.00 41.00 44.00 <br />15 31.00 34.50 38.50 42.50 45.50 49.00 <br />16 34.00 37.50 42.00 46.00 50.00 54.00 <br />18 41.00 45,00 50.00 54.00 59.50 65.00 <br />20 48.50 53.00 58.00 63.50 69.00 75.00 <br />21 50.50 55.50 60.50 66.00 71. 50 77.00 <br />24 62.00 69.00 75.50 82.00 88.50 95.50 <br />27 75.50 82.00 88.50 96.50 104.00 112.00 <br />30 89.50 96.50 103.00 111. 00 120.00 128.50 <br />33 104.50 111.00 116.50 126.50 13 7.50 148.50 <br />36 115.50 122.00 130.50 142.00 155.00 166.00 <br /> <br />!/ Unit construction cost including 10% allowance for <br />appurtenances. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.