My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01599
CWCB
>
Water Supply Protection
>
Backfile
>
14000-14999
>
WSPC01599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:55 AM
Creation date
10/9/2006 2:51:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.761.09.C
Description
Colorado River-Federal Agencies-US NPS-Black Canyon of the Gunnison National Monument
Basin
Colorado Mainstem
Water Division
5
Date
2/18/1975
Author
CWCB
Title
Legislation to Make BC a National Park-Gunnison Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />After weighing all reasonable alternatives, it has been determined <br />that extension of the existing municipal well field should be given <br />the first priority as phase one of the total project. Two wells in the <br />alluvium are recommended for initial construction. After reviewing <br />the geophysical work done and studying other relevant data, it appears <br />that these wells should be located north of the city and aligned in an <br />east-west direction in order to intercept migrating ground water stored <br />in the valley alluvium. It is believed that these wells would draw <br />from a different source than now being utilized by the existing wells. <br />It is entirely possible that further wells north of the city, in <br />addition to the two already proposed, could further enhance the future <br />water supply of the city of Gunnison. However, this cannot be deter- <br />mined until the first two wells have been in operation for a period of <br />a year or so. Development of surface water supplies from the Gunnison <br />River as phase two should be delayed until the adequacy and yield of <br />the proposed well field north of the city can be determined. It appears <br />inevitable, however, that the surface water supplies must be developed <br />at sometime in the-foreseeable future. <br />FINANCING <br />The city of Gunnison wishes to proceed with the financing of both <br />phases of the project at this time. The city requests that half the <br />cost, to wit, about $1,350,000, be made available during the coming <br />fiscal year from the Colorado Water Conservation Board Construction <br />Fund. The city proposes to issue municipal bonds for the remaining <br />50 percent of the estimated project cost. It is believed that these <br />bonds could be issued for a twenty-year period and marketed at an <br /> <br />-4- <br /> <br />000850 <br />
The URL can be used to link to this page
Your browser does not support the video tag.