My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01522
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:24 AM
Creation date
10/9/2006 2:49:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1996
Title
Boyle Contracts-Original-White River Basin Enhancement-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,7 <br /> <br />':APR-30-1996 12:32 FROM RIVERSIDE TECHNOLOGY,INC <br />I <br />I <br /> <br />TO <br /> <br />13038664474555 P.13 <br /> <br />· Stale: A formal en ineering report following the outline set forth by the Gunnison <br />River Basin docu ntation describing the enhancement of the White River Basin to <br />model one hundred percent ofthc water use in the basin. <br />. State: An on-line presentation of the final report. <br />!. RTiWR: Final cali ration graphics and tables <br />I <br /> <br />2.16 kscellancous <br />i <br />I <br />Obje~ive: It is the objeeti e of this la.~k to allow for certain unseen work items related to <br />exeeu~ng the above scope. T se items include making database changes to reflect current data <br />as well as making modificatio s to Phase II modeling assumptions. <br />I <br />I <br />APP1ach: <br /> <br />11. RTiWR: Make m 'fications to the data base to reflect current data, notto eJtceed 16 <br />t') \-\.05' , hours. <br />3r..- ' 12. RTiWR: <br />I hours. <br /> <br />2.17 40ntingenCY <br />i <br />I <br />Objeepve: It is the objecti e of this task to maintain a contingency fund consisting of 10 <br />perce*t of the original scoping cost. The original scoping cost is estimated to be ???????????? <br /> <br />I <br />i <br />! <br />I <br />I <br />i <br />I <br />I <br /> <br /> <br />'fications to the Phase II modeling assumptions, not to exceed {J:i:lrc <br /> <br />001.9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.