My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01522
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:24 AM
Creation date
10/9/2006 2:49:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1996
Title
Boyle Contracts-Original-White River Basin Enhancement-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:APR-30-1996 12:28 FROM RIVERSIDE TECHNOLOGY,INC <br /> <br />TO <br /> <br />13038664474555 P.05 <br /> <br />: · State: A memo dum documenting the 10 administration number classes for the <br />White River B 'in. <br />, · RTiWR: A fin I plot showing the watright runs used to detennine the 10 <br />~' ,administration umber classes. <br />31" \.0. &) ~~u.~\ <br />2.05. , Assign return flow ch- <br /> <br /> <br />Objec,ive: Assign and inc rate the return flow characteristics for each aggregated <br />irrigation structure. This task i . to be accomplished through the following specific work tasks: <br /> <br />Appmach: <br /> <br />;1. <br /> <br />: 2. <br /> <br />lo~f.. 3. <br /> <br />4. <br />~ 5. <br />'6. <br /> <br />RTiWR: Assig one of the three Phase II lag patterns to each aggregated <br />structure. <br />State: Oete retum flow locations for each aggregated structure through <br />visual inspectio of the GIS map, default is one return flow location per <br />aggregated stru e with the location being the next downstream node. It is <br />anticipated that 0 more than 5 aggregate structures will have return flow <br />locations other an the default. <br />State: Oocume t the dctenninalion of return flow characteristics in a 1-2 page <br />memorandum fi r consultant review. <br />RTiWR: Revie memorandum. <br />State: Incorpo Ie consultant comments. <br />RTiWR: Modif the.rtn fIle for up to 5 aggregated structures for which the <br />default return fl w characteriSlics to not apply. <br /> <br />: The Phase III effort wil not change the return flow patterns or locations associated with <br />, Phase n modeled struc res. <br /> <br />Deliverable: <br /> <br />, · State: A memorand m documenting the lag patterns and return flow locations <br />a~sociated with eac of the aggregated irrigatioll structures. <br />~. RTiWR: ST A TEM D dly and dds files representing assigned return flow <br />charaeteristics for > aggregated structures. <br /> <br /> <br />2.06. . Get water rights from . tabase and determine flow weighted administration number <br />! through a DMl <br /> <br />Objec~ve: cess the CRDSS database, retrieve administration numbers, and <br />calcul~te the flow weighted ad inistration numbers cOIrcsponding the administration number <br />classesl defined for the White Rver Basin. This task is to be accomplished through the following <br />I <br />specifip work tasks: <br /> <br />.,"' <br />I <br />I <br />0029 <br />I <br />, <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.