My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01522
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:12:24 AM
Creation date
10/9/2006 2:49:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8283.200
Description
Colorado River Basin-Colorado River Computer Models-Colorado River Decision Support System
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/1/1996
Title
Boyle Contracts-Original-White River Basin Enhancement-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APR-24-1996 15:59 FIU1 RIVERSIDE lECI+lCl..OOY,INC '10 <br /> <br />13il3866~ 'P;12 , <br /> <br />0") .' <br /> <br />'. <br /> <br />, <br /> <br />, <br /> <br /> <br />aggregated stnlctures, aggregatcd demand time series, adjustment to base <br />,'\ hydrology. The time allocated to makc calibration adjustments will not exceed 20 <br />~ f hours. If the Phase ill calibration is not within 20 percent of the Phase II <br />~ c ! ~ calibration after 20 man hours of effort, a change order will be required for any <br />, '-----additional calibration. <br />; 5. RTiWR: P uee visual com . ns tables and hs for the followin <br />, <br />! scen '05: hase ill . vel) vs. Phase n historic scenario, Phase <br />,-~'\l! ~ <br />(fullll8llregottM' level) vs. Bkllll~ m aiel! seenario. and Phase <br />aggregation level vs. historic diversions. <br />RTiWR: Document rhe calibration process in a 4-6 page memo for State review. <br />RTiWR: IncorporAte State comments. <br />~ C\'c RcQ.uu~'......, - e l", <br /> <br /> <br />f <br /> <br />/()'\ <br /> <br />A I,,,; <br />$~ <br />6 :~o 17. <br />2,'-\'I-~ I <br />~ "\.,-0 l)QIivdrables: <br /> <br />'2>-x.L:> <br /> <br />. A memorandum documenting the calibration process and results including the <br />minutes from the calibration meeting. <br />. A set of ST A TEMOD input files (HistoriC and Calculated) whieh show a degree of <br />calibration to within 20 perccnt of the Phase n calibratioo effort. <br />I <br /> <br />2.14, I Prepare baseline scenario <br />, <br />I <br />Objec!ive: For the White River Basin, generate the baseline data files. A baselioe scenario <br />data set will be prepared that reflect all input demand and operational data at a current level of <br />opera4ons. The consultant will adjust the baseline to reflect changes ia operational data which <br />have ljecomc apparent since Phase 1L This ta.~ 15 to be accomplished through the following <br />speci~c work tasks: . <br />i <br />APPfllach: <br />, 5~ <br />11. ~: Consult with Division engineers and State personnel to determine changes <br />I in operational procedures since the Phase II modeling effort. <br />'-/ ~ ! 2. RTiWR: Modify the ST A TEMOD input mes to incorporate changes in operational <br />( procedure. <br /> <br /> <br />A set of STAlEMOD input files (Baseline) which reflect current operational <br />procedures in thc basin. <br /> <br />, <br />2.15. : Prepare fmal documentation <br />i <br /> <br />Objecjtive: For the White River B8Ilin, prepare the final documentation. As the activities far <br />each ~ubtask are performed. a written draft chapter describing the procell.'! and results will be <br />prepufed g~"- l!flll:!lfl{ant aIllt'8utllDl\\~~ ._ J.~ State. Significant revisions to the process of the <br />subtaSk wi II cause a rcgelle....rtion of the written draft ehapters and resubmlttal to the Slate. The <br /> <br />0036 <br />
The URL can be used to link to this page
Your browser does not support the video tag.