Laserfiche WebLink
<br />I <br /> <br />;": <br /> <br />"c 0 0 1 7 5 3 <br /> <br />,. <br /> <br />WEATHER <br /> <br />The weather during the month was sufficienllly severe to hamper, <br />but net prevent, field survey activities in the Closed Basin area. <br /> <br />PLANS FOR OOJlIBG MON!H <br /> <br />The project activities duriDg February, 1946, will be 1arge1J' <br />centered on office studies in connection with the Conejos Division, <br />the 010eed Basin Division, and water eupp1J' studies in conneotien <br />with tranemeuntain diversions. l'ie14 surveys for relocation of' <br />highwqs around the Oounsellor Reservoir Site will be in progress; <br />and. topographic surveys of reservoir sites on the upper Rio Grande <br />for storage and regulatioa of the flows of the Rio Grande 8.11d the <br />transmountain diversion under the oomprehensive plan for the ultimate <br />development of the San Luis Valley will be initiated during the month. <br /> <br /> <br />,/ ~uL ~ <br /> <br />. H. Forester <br />Project Engineer <br />Barean of Reolamation <br />