My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01387
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:56:27 AM
Creation date
10/9/2006 2:45:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8045
Description
Section D General Studies-Federal Projects-General
Date
1/1/3000
Title
Moon Lake Power Plant Project-Corres 1977-81-Comments of the Rio Blanco Board of County Commissioners on Draft Environmental Impact Statement for Moon Lake Power Plant Project-Units 1 and 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I... <br /> <br />. <br /> <br />. <br /> <br />". <br /> <br />" <br /> <br />- 55 - <br /> <br />'- <br /> <br />, <br /> <br />correctly notes (at 183), a feasibility and preliminary <br />engineering study of the Taylor Draw Reservoir project <br />has been completed. Funding for the project has been <br />addressed through a $13 million bond issue approved by <br />the residents of the area in August 1980. Applications <br />for the requisite permit approvals have been filed with <br />BLM and the U.S. Army Corps of Engineers. A preliminary <br />environmental assessment has been prepared. The federal <br />government should be able to complete the environmental <br />reviews required by NEPA, including Fish and. Wildlife <br />Service endangered species studies, by the end of 1981. <br />Shortly thereafter, the federal agencies would be in a <br />position to take final action on outstanding permit <br />applications. Project engineers have advised that final <br />engineering designs will be completed by the fall of 1981. <br />With a construction start in the spring of 1982, <br />and conservatively allowing a two-year construction pe- <br />riod, the Taylor Draw Reservoir would be on-line before <br />the end of 1984. This construction schedule will meet <br />the needs of Unit 1 of the power plant. <br />If Deseret elects to test or operate Unit 1 prior <br />to completion of Taylor Draw, there is no reason why <br />temporary arrangements could not be made to pump water <br /> <br />~ <br /> <br />~ <br /> <br />037., <br />
The URL can be used to link to this page
Your browser does not support the video tag.