Laserfiche WebLink
<br /> <br />01'11136 <br /> <br />-4- <br /> <br />"I <br /> <br />C. Projeots on the l,!ain Stem of the Colorado River havinq <br />a benefit-cost ratio of 1.0 or hiqher, and which require'the <br />irrigator to repay at least nine peroent- of the conltruction <br />cost and which will not interfere with oil shale development and <br />the proposed DeBeque Reservoir, will use 82,100 aore-feet. They <br /> <br />'. <br />. <br /> <br />;> <br /> <br />are: <br /> <br />~~ <br /> <br />Parshall 28,600 <br />Troublesome 13,000 <br />Rabbit Ear 16,400 <br />Eagle Divide 12,000 <br />Woody Creek 1,400 <br />Battlement Mesa lQ.700 <br />Sub-total 82,100 <br /> <br />D. Projects in the San Juan Basin, the San MiOUel, the <br /> <br />Animas-La Plata and the Dolores, having a benefit-cost ratio of <br /> <br />1.0 or higher, and which will require the irdqator to pay at <br /> <br />least nine percent of the construction coat, will use 143,780 <br /> <br />,- <br /> <br />acre-feet. <br /> <br />.' <br /> <br />E. A project in the Whi te-Yampa cub, the Savery-Pot Hook, <br />confonningto the standards mentioned in B., C. and D., will use <br />20,000 acre~feet. <br />This gives a grand total of 377,000 acre-feet as the consumptive <br />use that, on the assumptions mentioned, should be provided for in the <br />future development of land by the Reclamation Bureau. On restudy, <br />several of the projects included may not reach the benefit-cost <br />ratio required. <br /> <br />~l <br /> <br />~A lover repayment by irrigator than any participating project <br />proposed by other Upper Basin States. <br />