My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01304
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:10:54 AM
Creation date
10/9/2006 2:42:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
USDOI/BOR
Title
Agricultural Engineering Study - Animas and Florida Watersheds - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1339 <br /> <br /> <br />quantities in the range of one foot average cuts at a cost of $0.50 to <br /> <br /> <br />$1.00 per cubic yard. As a conservatively low estimate, an average <br /> <br /> <br />6-inch cut at $0.50 per cubic yard for a total cost of $403 per acre <br /> <br />was assumed for this Task D analysis. Amortizing this cost at 8-3/8 <br /> <br /> <br />percent interest over 50 years gives a cost of $34.40, or in round <br /> <br /> <br />numbers, $35 per acre. This cost was then included in the on-farm <br /> <br /> <br />costs for gravity irrigation. <br /> <br />D.3 OFF-FARM IRRIGATION TRANSMISSION SYSTEM COST <br /> <br /> <br />D.3.1 General <br /> <br /> <br />The off-farm irrigation transmission facilities will generally <br /> <br /> <br />consists of transmission pipelines, pumping stations, and diversion <br /> <br /> <br />facilities. Roads for access to pump stations; rights-of-way; and <br /> <br /> <br />the extension of electrical power services to pumping stations were <br /> <br /> <br />not included in the cost analysis. Costs for those items included <br /> <br /> <br />are based on experience with similar facilities. All costs are then <br /> <br /> <br />amortized using a discount rate of 8-3/8 percent over a 50 year <br /> <br /> <br />project life. <br /> <br />D.3.2 Pumping Stations <br />Pump station costs were estimated using an equation which considers <br /> <br />flow and horsepower as variables. The equation is based on Boyle's <br /> <br />experience with various size agricultural pump stations which <br />include pump motor, pump structure, valves, surge control, and power <br /> <br />panel. The equation is: <br />Cost, $ = 2441(GPMP.4l + 150(HP)1.05 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.