My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01304
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:10:54 AM
Creation date
10/9/2006 2:42:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.100
Description
Ute Tribes
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
6/1/1987
Author
USDOI/BOR
Title
Agricultural Engineering Study - Animas and Florida Watersheds - Final Report - Design-Cost Estimate for Off-Farm Irrigation Facilities and PIA Determination
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1343 <br /> <br />of 1985. A detailed discussion of the power costs was previously <br />provided. <br /> <br />0.3.6 Other Costs not Included <br />Other known costs which could be considered are costs for access <br />roads to the pump stations, right-of-way costs where pipelines or <br />pump stations may be on non-Indian land, and costs to provide <br /> <br />electric power service to the pump station. These costs are either <br /> <br />minor and/or difficult to estimate with available information. <br /> <br />Therefore, for these preliminary analyses, they have not been <br /> <br />considered at this time. <br /> <br />The cost of power line extensions to serve pumping facilities could <br /> <br /> <br />be quite high, especially if three phase power is required. Three <br /> <br /> <br />phase power will be required for pump stations over 25 horsepower. <br /> <br />0.4 PRELIMINARY PRACTICABLE IRRIGABLE ACREAGE <br /> <br /> <br />0.4.1 Existing Irrigated Lands <br /> <br /> <br />Lands currently irrigated are assumed to be PIA requiring no further <br /> <br /> <br />evaluation. Table 0.2 summarizes the currently irrigated acreage <br /> <br /> <br />in the two watersheds. The acreage is also identified on maps <br /> <br /> <br />included as Figure 0.1, 0.2, and 0.3. <br /> <br />0.4.2 Water Supply <br /> <br /> <br />An examination of the hydrology data for the Animas and Florida <br /> <br /> <br />rivers shows that there is sufficient virgin flow during the summer <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.