Laserfiche WebLink
<br />-. <br /> <br />00 iJ19if <br /> <br />~- - - ~ <br /> <br />82 <br /> <br />OPEHATIOX, ':\lAI=--TEXAXCE, AXD REPLACKME:".""l' COSTS <br /> <br />Annual opertttion, mnintcllllIlcC, and replacement costs estimated Oil <br />the bnsis of current prices for the snh'ugc of 86,500 acre-feet of ground <br />wal-er nrc summarized in table 3. <br /> <br />T,\llu: 3.-Summary of estimated operation, maintenance, and <br />rcplacement co.~18 <br />Pcr:;onnel rcquirclUcnbL_____ ____ ____________~_~__ _________ --- <br />Transmission Iincsn_________________________________._ _______ - <br />!:urnp JJ.1aintenance____________ __________._______.____ --------- <br />~ub~a~ons_________________________ <br />o . I . t 't <br />.~pccla n~am ,cnance 1 ('nUL_ n_ _ _ _ uu _ _ _ _ _ u____ _ _ _ _ _ _ __ _ _ _ --- --- <br />CommuOlcatlOns______________________ _ ________.______ ---.--- <br />Equiplncnt. ___ __ __ _ _ _ _ _ _ _ _~ _ __ __ __ _ __ _ _ _ _ _ _ _ ~_ _ - - - -- - - - - -- - - -- <br />Annual supplies___________________ _ __~__________ ----------- <br />Administrative cxpcnsc____ _ _____ _ _ _ _ _ _ _ _ ------ - - - - - - - - - -- - - - - -- <br />Energy_______________________ _________________ - ------------- <br />~p('cial itcmg________________ _________ _.____~____ ___n________ <br /> <br />TotaL _ __ ____n ___ <br /> <br />COXSTRt!CTIOX SCHEDULJo; <br /> <br />$21, uOO <br />l::?,OOO <br />14,000 <br />2,000 <br />32 000 <br />I: 000 <br />17,000 <br />0.000 <br />11,000 <br />61,000 <br />6.000 <br /> <br />186. 000 <br /> <br />The telltllti\'l~ schedule of construction is presented in the control <br />schedule (form PF-2). It. assumes that. funds will hI' avnilahle the first <br />fiscal year for necessary prl'collstruction net ions, consi:;ting of detHiled <br />surveys, preparation of pbllls and specifications, land IlCflllisition, <br />negotitltion of npproprinte n{!rCemcllts, und prepuratioll of u definite <br />pInn report.. On the hu;;is tbnt no t1llfort's(,cll dclnys in prosecution of <br />tht'se activities would be (>ncoHntl~rcd, award of the contruct for COB- <br />st.ruction of the first-stnge \\'l1t('r snlvnge fe:Itures would be made durin~ <br />the second fisenl ypar. The schedule cOlltempllttes thnt nil major project <br />features would be l'ompl('tt'd within S .yt'tll'S nfter lluthorizatioll. <br />