My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01296
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:10:51 AM
Creation date
10/9/2006 2:40:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8541
Description
San Luis Valley Project
State
CO
Basin
Rio Grande
Water Division
3
Date
1/1/3000
Title
San Luis Valley Project Closed Basin Division - 1970-1971 - A Report on Closed Basin Division, San Luis Valley Project, Colorado - House Document No. 91-369, 91st Congress, 2d Session
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-00 frtt-7 <br /> <br />103 <br /> <br />recordC'd depletion between Del NOTte and Alnmosn for the 1951-60 <br />period, shown on dmwing 253-504-1828, was used to estimate the <br />depletion between Del:\'" ort(' and .Alnffiosa. ThcSl' depletions were then <br />used to estimnte the snh'nged wnt('r required to maintain the scheduled <br />Rio Grande compact delivery at Lobulos. <br />To estimate the depletions thut would occllr in the Conejos di,-ision <br />unci the umount of sulnlgecl wutcr required to maintain the equi\"1l.lent. <br />of the scheduled Rio Grnnde compllet deli\'ery at La Sa Uses, n study <br />Wl\S made of Plat 01'0 Heservoir open1tin~ without restriction under the <br />terms of the Rio Ornude ('ompuc.t. TillS reservoir operation study is <br />summarized 011 IlIl IlllllWd basis in table 14. The outflow from the <br />Conejo~ dh'ision was bused uJlon the relationship between the total <br />inflow to the Conejos dh'ision (the sllm of t.he clllendnr yenr dh;chllrges <br />of the Conejus Hh'er neur )'Iogote, the Lo~ Pinos River Ilesr Ortiz, <br />tUld the San Antonio River Ilear Ortiz) and the outflow at La Sause:;; <br />for the period 1951-60, showll 011 dru."I;ing 253-504-1R30. <br />From the nnalvsis :-.et forth in tllble 13, it is estimated thnt the <br />unnutd \'olume (I( snlvnged wuter required to lIluintllill the scheduled <br />Rio Grllnde compact delh'ery nt Lobatos would llverage 54,800 ncre- <br />feet.. Of this totul, 23,800 nere-feet would be required hy the Rio <br />Grllllde di,'ision Ilnll 31,000 nere-feet would be required by the Couejos <br />divisioll. <br />
The URL can be used to link to this page
Your browser does not support the video tag.