My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC01267
CWCB
>
Water Supply Protection
>
Backfile
>
13000-13999
>
WSPC01267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 11:10:38 AM
Creation date
10/9/2006 2:39:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.950
Description
Section D General Studies - General Water Studies
State
CO
Basin
Statewide
Date
1/1/3000
Author
Unknown
Title
Colorado Water Study - Engineer Resumes - Volume II - M-Z
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001480 <br /> <br />. FREDERICK A. RICLES <br />Water Resources Engineer <br /> <br />Education <br /> <br />B.S., Civil Engineering. University of Maryland, 1977 <br />M. B. A., Business Administration, University of Maryland, 1970 <br />B. S., Business Administration, University of Maryland, 1969 <br />, ,~) <br />I, . . <br /> <br />Experience <br /> <br />Mr. Ricles has experience as a civil engineer in water resources <br />relating to site surveys and field inspections, preparation <br />of watershed maps, data collection, preparation of water <br />surface profiles, and preparation of preliminary project <br />assessments. <br /> <br />He has been involved with the following projects: <br /> <br />.. Development of hydrologic data including annual <br />runoff yields for the Wild Horse Creek Reservoir <br />portion of the Amity Mutual Irrigation Company, <br />Holly, Colorado P.L. 984 Reconnaissance Study. <br />Also involved in development of cost data for irri- <br />gation canal structures. <br /> <br />II Prel iminary and final design of Southeast Interceptor <br />Project, City of Greeley, Colorado. <br /> <br />a Field investigation and development of cleaning and <br />inspection program for sanitary sewer system, City <br />of Greeley, Colorado. <br /> <br />.. Clear Creek Interceptor predesign report, Metropol itan <br />Denver Sewage Disposal District No.1, Colorado. <br /> <br />D Design of expansion of raw water supply line from <br />Horsetooth Reservoir, City "of Fort Collins, Colorado. <br /> <br />.. Preliminary design and economic feasibility for Bio-Gas <br />of Colorado, Inc., Lamar, Colorado. This study con- <br />sists of the bio-conversion of animal waste to methane <br />gas involving anaerobic digestion, solids dewatering <br />and handling, and algae cultivation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.