Laserfiche WebLink
<br />Qui It38 <br /> <br />1971 to Feb. 1980 - GINGERY ASSOCIATES, INC. <br />Cons~lting Engineers (Englewood, Colorado) <br /> <br />Employed initially as a hydrologic, project engineer responsible for <br />completing hydrology analyses and hydraulic studies for drainage and <br />flood control projects. An initial ,assignment\,was to program the <br />Colorado Urban Hydrograph Procedure, to include a hydrograph lagging <br />and adding routine and a simple reservoir routing routine, all on an <br />IBM 1130. Also, special training was received from the Corps of <br />Engineers, Hydrologic Engineering Center personnel on the use and <br />application of the HEC-2 Water Surface Profiles computer program, <br />in 1972. <br /> <br />~1 <br />f:d,,- <br />f_~l <br /> <br />In 1973, became a Project Manager and eventually Manager of the Drain- <br />age and Flood Control Section of the firm. Responsibilities increased <br />to include proposal preparation, project layout, personnel assignments, <br />budgeting and scheduling, client laison, and project reporting includ- <br />ing public presentations. . <br /> <br />~ <br />, <br /> <br />Principal designation was given in 1974 and responsibilities included <br />serving as Manager of the Municipal and Water Resources Section, over- <br />seeing 20 engineers and technicians involved in a full range of en- <br />gineering projects including hydrology and hydraulic studies of flood <br />plains, drainage and flood control system planning, hydraulic facilities <br />design, civil works design, waste-water system analysis and design, <br />water transmission system analysis and design and const.ruction manage- <br />ment. Responsibilities were both administrative and job related, <br />involving contract negotiation, project assignments, staffing, <br />project review and quality control, new business development and <br />proposal preparation. <br /> <br />Ownership in the firm was obtained in 1973. Have also been a director <br />and officer in the firm since 1975. Upon resigning, was Executive <br />Vice President and also a director of Riford Corporation, a site develop- <br />ment entity partially owned by Gingery Associates, Inc. <br /> <br />::C_,j <br />,- <br />,- <br /> <br />-I <br />I <br /> <br />Typical projects completed while at Gingery Associates, Inc. include: <br /> <br />* Dry Creek Drainageway Planning for City of Ft. Collins, Larimer <br />County and Colorado Water Conservation Board. <br />* Big Thompson River and Tributaries Flood Plain Information Report <br />following the disastrous flood of July 31, 1976, for Larimer <br />County, Colorado Water Conservation Board and Federal Insurance <br />Administration. <br />* Flood Insurance Studies for Federal Emergency Management Agency- <br />Detailed and approximate flood insurance studies in 65 Colorado <br />and Utah communities, involving the determination of 10-, 50-, <br />100-, and 500-year flood magnitudes and profiles, production of <br />flood boundary and floodway maps, flood insurance rate maps, and <br />reports. <br />* Floodway Analysis for City of Boulder, Colorado, analyzing effects <br />of various floodway criteria on Boulder Creek through Boulder, CO. <br /> <br />~I <br />=i <br /> <br />-2- <br />