Laserfiche WebLink
<br />0111436 <br /> <br />Patrick F. Mulhern, P.E. <br />Page 2 <br /> <br />· Big Thompson River Floodplain Information Study. Completed <br />detailed hydrology and hydraulic studies on approximately <br />40 miles of the Big Thompson River and tributaries following <br />the flood of 7/31/76, Project Engineer. <br /> <br />· Beaver Creek Ski Area. Assisted in the design of 3.5 miles <br />of entrance roads. Design Engineer. <br /> <br />, <br />, <br />-~ <br />, <br /> <br />1975 to 1976 - Staff Hydrologist, Dames & Moore, Bethesda, MD. <br />Responsibilities included evaluating technical data pertaining <br />to appeals of the hydrologic and hydraulic analyses performed <br />on flood insurance studies, making recommendations and submit- <br />ting subsequent adjustment of studies. <br /> <br />'J <br />.J <br /> <br />1973 to 1975 - Colorado State University, Ft. Collins, CO. <br />Graduate Research Assistant and Engineering Technician while <br />completing master's degree. Mr. Mulhern's thesis was "The <br />Form Pattern on the Gros Ventre River, Jackson Hole, WY" in <br />which he analyzed the effects of sedimentation on changing river <br />patterns. <br /> <br />I <br />1 <br /> <br />Papers: <br /> <br />"1976 Big Thompson Flood & Flood Recovery Planning". <br />at ASCE National Convention.) <br /> <br />(Presented <br /> <br />Short Courses: <br /> <br />"Highways in the River Environment". <br />Highway Administration, 1975.) <br /> <br />(Presented by the Federal <br /> <br />~1 <br /> <br />"Hydrology for Highway Engineers". <br />Highway Administration, 1978.) <br /> <br />(Presented by the Federal <br /> <br />l <br />= <br />-, <br /> <br />'~ ~ <br /> <br />I <br />I <br />